GTT Receives LNG Carriers Tank Design Order From HD KSOE

February 2, 2026

© GTT
© GTT

GTT announced that it has received, in early 2026, an order from HD Korea Shipbuilding & Offshore Engineering (HD KSOE) for the tank design of four new Liquefied Natural Gas Carriers (LNGCs).

The LNGCs will be built by the shipyard HD Hyundai Heavy Industries, each with a capacity of 200,000 m³. The cryogenic tanks of the vessels will be equipped with the Mark III Flex+ membrane containment system, developed by GTT.

Delivery of the vessels is scheduled between the third quarter of 2028 and the first quarter of 2029.

Logistics News

Tuapse Port Fire Extinguished Days After Ukrainian Drone Attack

Tuapse Port Fire Extinguished Days After Ukrainian Drone Attack

Port of Antwerp-Bruges Reports Weak Start to the Year

Port of Antwerp-Bruges Reports Weak Start to the Year

Hydrogen Fuel Cell Harbor Craft Pilot Study Launched in Singapore

Hydrogen Fuel Cell Harbor Craft Pilot Study Launched in Singapore

BIMCO Warns of Hormuz Toll Scam

BIMCO Warns of Hormuz Toll Scam

Subscribe for Maritime Logistics Professional E‑News

Russia claims new EU sanctions will harm developing countries
Sources say that US-Iran peace talks may resume in Pakistan, and the Iranian foreign minister is due to arrive.
Source: Six Swiss International passengers injured in India after flight aborts.