World's Largest Vessel Set to Sail in 2018

December 25, 2017

 In 2018,  Shell's huge floating liquefied natural gas (FLNG) Prelude, the world's largest vessel, will begin its job of extracting and processing gas at sea, reported CNBC.

 
The 488-meter-long and 74-meter-wide floating facility left the shipyard in South Korea in late June and reached the Australian waters in late July. 
 
Currently, the vessel, which is almost one-third of a mile long with a deck longer than four soccer fields,  sits at its first location, Shell's Prelude gas field, around 125 miles north off the Western Australian coast.
 
The Prelude facility weather vanes 360 degrees around a turret, moored in 248 meters of water. Three stern thrusters enable Prelude to maintain an optimum heading that will facilitate offtake operations within the design limits of the facility and associated cargo transfer equipment.
 
Despite its ship-like appearance, the Prelude vessel is not in the strictest sense a boat as it needs to be towed to its destinations.
 
Fully operational, Shell says it will harvest at least 5.3 million tons per annum (mtpa) of liquids — 3.6 mtpa of LNG, 1.3 mtpa of condensate and 0.4 mtpa of liquefied petroleum gas.
 
The company claimed that amount of gas would be more than the annual needs of Hong Kong.
 
The gas is to be pumped up from below the seabed to the floating platform, where it is then cooled. It is fitted with the necessary equipment for exporting LNG/LPG via side by side mooring and loading arms and Condensate via a tandem mooring and floating hose system.
 
It is moored to the sea bed via 16 anchor piles and chains whilst being directly connected to wells that access the gas reservoir via flexible risers routed through the turret. All reservoir, subsea control, processing, storage and loading is operated and controlled from Prelude.
 

Logistics News

ADNOC LNG Tanker Crosses Strait of Hormuz

ADNOC LNG Tanker Crosses Strait of Hormuz

Trump Grants 90-day Extension to Jones Act Waiver

Trump Grants 90-day Extension to Jones Act Waiver

Raw Sugar Futures Falls After Two-Week High Alongside Coffee, Cocoa

Raw Sugar Futures Falls After Two-Week High Alongside Coffee, Cocoa

US Corn, Wheat, Soy Futures Rise Alongside Crude Oil

US Corn, Wheat, Soy Futures Rise Alongside Crude Oil

Subscribe for Maritime Logistics Professional E‑News

Rio Grande extends its LNG facility construction in Texas for three years
Source: Ukraine will take action against Israel if a grain ship docks
Airline cancels flights due to Middle East conflict