Vestdavit to Equip Norwegian CG Vessels

September 10, 2019

Photo courtesy of Vestdavit
Photo courtesy of Vestdavit

Vestdavit secured an order to supply three new Norwegian Coast Guard vessels with davits equipped for polar conditions, in a project which also calls for installation of a deck-mounted transfer system for rapid deployment.

The ships are being built by Vard Group within the P6615 project to replace Nordkapp-class ships with a new generation of search-and-rescue, surveillance, and oil recovery vessels. The 136m length newbuildings have been developed for worldwide operations including arctic areas and will feature ice-strengthened hulls and ice-class notation on their delivery from Vard Langsten, Norway, one apiece in 2022, 2023 and 2024.

Each vessel will come complete with one telescopic TBD-10000L davit system plus two PLR-5003KV units, built to Vestdavit standards for minimum availability of 330 days a year up to upper Sea State 5, based on actual North Sea conditions 1958-2018. In line with the areas of operation envisaged, the davits will be winterized for full functionality in temperatures as low as -25deg C, as required in the Polar Code.

Logistics News

Liebherr USA Appoints New Divisional Director

Liebherr USA Appoints New Divisional Director

Port Houston Surpasses Three Million TEUs

Port Houston Surpasses Three Million TEUs

Trump, Xi Pause Port Fees on Each Other's Vessels

Trump, Xi Pause Port Fees on Each Other's Vessels

US Grants India Sanctions Waiver to run Iranian Port

US Grants India Sanctions Waiver to run Iranian Port

Subscribe for Maritime Logistics Professional E‑News

Buffett will send a letter to his children and shareholders as well as Abel's annual letter, according to WSJ
Data show that Russian pipeline gas exports into Europe increased by 5% m/m during October.
Shooting on Greek island Crete leaves two dead and 10 injured