ABB Wins $110M Order, Platform Power Link

April 15, 2010

ABB, the leading power and automation technology group, has won an order worth $110m from Eni Norway AS, to build a power link between a new oil and gas platform in the Barents Sea and the Norwegian power grid. The order was booked in the first quarter.

The Goliat platform will be partly electrified by a 106 km subsea power cable, which can lower Goliat's carbon dioxide emissions up to 50 percent by reducing the need for electricity produced by the platform's gas turbines.

The 123kV (kilovolt) 75MW (megawatt) XLPE insulated cable is claimed to be the longest, most powerful cable ever delivered for an offshore application. It will supply AC (alternating current) power from the mainland grid in Norway to Goliat, a floating oil and gas production, storage and offloading unit.

The cable integrates fiber optics to monitor temperature and provide general communication services, and includes a 1.5 km dynamic section to accommodate the movement of the floating platform. The project is scheduled for completion by the end of 2013, when Goliat is due to begin operations.
 

Logistics News

Melvin Resigns as President of South Carolina Ports Authority

Melvin Resigns as President of South Carolina Ports Authority

Brazil Ships More Iron Ore to China, Competitors Lag

Brazil Ships More Iron Ore to China, Competitors Lag

Great Lakes Dredge & Dock Takes Delivery of Hopper Dredge

Great Lakes Dredge & Dock Takes Delivery of Hopper Dredge

Kabal Wins Contract with Phu Quoc Petroleum Operating Company to Optimize Offshore Logistics in Vietnam

Kabal Wins Contract with Phu Quoc Petroleum Operating Company to Optimize Offshore Logistics in Vietnam

Subscribe for Maritime Logistics Professional E‑News

Rubio: US stops worker visas for truck drivers
Greece's tourism sector enjoys a 6 billion euro profit in the first half of 2025
What do we know about the Nord Stream explosions?