marine link image

ABB Wins $110M Order, Platform Power Link

April 15, 2010

ABB, the leading power and automation technology group, has won an order worth $110m from Eni Norway AS, to build a power link between a new oil and gas platform in the Barents Sea and the Norwegian power grid. The order was booked in the first quarter.

The Goliat platform will be partly electrified by a 106 km subsea power cable, which can lower Goliat's carbon dioxide emissions up to 50 percent by reducing the need for electricity produced by the platform's gas turbines.

The 123kV (kilovolt) 75MW (megawatt) XLPE insulated cable is claimed to be the longest, most powerful cable ever delivered for an offshore application. It will supply AC (alternating current) power from the mainland grid in Norway to Goliat, a floating oil and gas production, storage and offloading unit.

The cable integrates fiber optics to monitor temperature and provide general communication services, and includes a 1.5 km dynamic section to accommodate the movement of the floating platform. The project is scheduled for completion by the end of 2013, when Goliat is due to begin operations.
 

Logistics News

CMA CGM Celebrates Maiden Call of New Port Kobe Service

CMA CGM Celebrates Maiden Call of New Port Kobe Service

New Wildlife Trafficking Compendium Released for Singapore

New Wildlife Trafficking Compendium Released for Singapore

Australia’s Port of Newcastle Sets Diversified Trade Record

Australia’s Port of Newcastle Sets Diversified Trade Record

Bahrain Circulates Revised UN Hormuz Draft

Bahrain Circulates Revised UN Hormuz Draft

Subscribe for Maritime Logistics Professional E‑News

Automobile industry group urges for the scrapping of US gas tax and adoption of vehicle fee
Malaysia Airlines reports higher earnings by 2025, but Middle East conflict clouds the outlook
Switzerland says that cancelling the U.S. Patriot system order is an option