Tango FLNG En Route to Argentina

December 27, 2018

(Photo courtesy of EXMAR)
(Photo courtesy of EXMAR)

Belgium based EXMAR announced Thursday that its floating liquefied natural gas (FLNG) facility has left China for a 45-day voyage to the destination of its liquefaction operations at the Port of Bahia Blanca in Argentina.

The barge-based Tango FLNG (previously named Caribbean FLNG) is on the move just one month after a contract was signed for a firm, 10-year deployment.

Upon its arrival, the facility will be put in operation for EXMAR’s customer YPF S.A. and is expected to start up LNG production in the second quarter of 2019. Tango FLNG is designed for a liquefaction capacity of about 500,000 tons tons of LNG per year and will play a central role in YPF’s efforts to export LNG from the Vaca Muerta source at the Neuquén Basin in Argentina to the international markets. Up to eight LNG cargoes per year will be produced over a 10-year period.

EXMAR said the hire rate of the unit is partially based on a floating rate with an expected EBITDA of around $43 million per year based on the estimated production of the Tango FLNG, with upside potential depending on the market environment.

Logistics News

New Zealand selects two LNG terminal bidders for energy security

New Zealand selects two LNG terminal bidders for energy security

Port Everglades Contributes $48.3b in Economic Impact, 300,000 Jobs for Florida

Port Everglades Contributes $48.3b in Economic Impact, 300,000 Jobs for Florida

Report Details Four Ship Breakaways During Storm

Report Details Four Ship Breakaways During Storm

Consortium to Advance e-Fuel Green Corridor Between Brazil and Belgium

Consortium to Advance e-Fuel Green Corridor Between Brazil and Belgium

Subscribe for Maritime Logistics Professional E‑News

Senators want to investigate the US Transport chief's road trip, which was paid for by corporate donors
S&P downgrades JetBlue deeper into junk as high fuel costs dent recovery
Repairs to the Norway-Denmark cable will reduce its capacity by 245 MW until September