Massive TP's Shipped for Taiwan Windfarm

August 13, 2019

Photo: Jumbo
Photo: Jumbo

Jumbo reports completion of a shipment of the "heaviest, tallest and the largest diameter "Transition Pieces (TP’s) it has ever transported.

The TP’s were shipped for Jan De Nul Group in cooperation with brokers Multi Marine Chartering B.V. from Laem Chabang to Taichung, where they will form part of Taiwan’s Formosa 1 Phase 2 Offshore Wind Farm (OWF).

The Formosa 1 OWF will have a total capacity of 128MW once built and commissioned. Phase 1 of Formosa 1 features two Siemens 4MW demonstration turbines, the first ever wind turbines to be installed off Taiwan. The Formosa 1 Phase 2 is owned by Formosa I Wind Power Co. Ltd., a partnership of Ørsted (35%), JERA (32.5%), Macquarie Capital (25%), and Swancor Holding (7.5%).

In advance of the shipments, Jumbo coordinated the fabrication of 12 grillages which act as individual secure holdings on deck for each TP.  After installing the grillages onboard the Jumbo Kinetic, the vessel set sail to Laem Chabang to set the project in motion.

The TP’s were  secured to the grillages on board the Jumbo Kinetic by her specialized team and then moved in 3 shipments from Laem Chabang to Taichung. 

In total 20 TP’s with a diameter of 7.8 x 30 m high and a weight of 462 tonnes each were shipped.

Logistics News

Liebherr USA Appoints New Divisional Director

Liebherr USA Appoints New Divisional Director

Port Houston Surpasses Three Million TEUs

Port Houston Surpasses Three Million TEUs

Trump, Xi Pause Port Fees on Each Other's Vessels

Trump, Xi Pause Port Fees on Each Other's Vessels

US Grants India Sanctions Waiver to run Iranian Port

US Grants India Sanctions Waiver to run Iranian Port

Subscribe for Maritime Logistics Professional E‑News

Hassan, a Tanzanian, is declared the winner of an election marred with violence.
Staff of the Border Force patrolling UK waters are planning a strike over pay
ITA Airways will resume flights from and to Tel Aviv on January 1, 2019.