Massive TP's Shipped for Taiwan Windfarm

August 13, 2019

Photo: Jumbo
Photo: Jumbo

Jumbo reports completion of a shipment of the "heaviest, tallest and the largest diameter "Transition Pieces (TP’s) it has ever transported.

The TP’s were shipped for Jan De Nul Group in cooperation with brokers Multi Marine Chartering B.V. from Laem Chabang to Taichung, where they will form part of Taiwan’s Formosa 1 Phase 2 Offshore Wind Farm (OWF).

The Formosa 1 OWF will have a total capacity of 128MW once built and commissioned. Phase 1 of Formosa 1 features two Siemens 4MW demonstration turbines, the first ever wind turbines to be installed off Taiwan. The Formosa 1 Phase 2 is owned by Formosa I Wind Power Co. Ltd., a partnership of Ørsted (35%), JERA (32.5%), Macquarie Capital (25%), and Swancor Holding (7.5%).

In advance of the shipments, Jumbo coordinated the fabrication of 12 grillages which act as individual secure holdings on deck for each TP.  After installing the grillages onboard the Jumbo Kinetic, the vessel set sail to Laem Chabang to set the project in motion.

The TP’s were  secured to the grillages on board the Jumbo Kinetic by her specialized team and then moved in 3 shipments from Laem Chabang to Taichung. 

In total 20 TP’s with a diameter of 7.8 x 30 m high and a weight of 462 tonnes each were shipped.

Logistics News

Port of Brownsville Welcomes Local, Industry Leaders at State Address

Port of Brownsville Welcomes Local, Industry Leaders at State Address

US Sanctions Cuban State Oil Company

US Sanctions Cuban State Oil Company

Los Angeles Adopts $3.4 Billion Port Budget

Los Angeles Adopts $3.4 Billion Port Budget

Spiridon II Livestock Transport Organizer Due in Court

Spiridon II Livestock Transport Organizer Due in Court

Subscribe for Maritime Logistics Professional E‑News

India opens the way for safety cars and self-driving technology to reduce road fatalities
UK anti-Islam Robinson detained briefly under terrorism laws
Shell pauses its $3 billion share purchase ahead of ARC vote