Korean Yard Wins Chevron FPSO Contract

April 12, 2013

Model HHI FPSO: Image credit HHI
Model HHI FPSO: Image credit HHI

Hyundai Heavy Industries (HHI) to build a US$ 1.9-billion order Floating Production Storage and Offloading unit (FPSO) for Chevron North Sea Ltd.

Hyundai Heavy is to carry out engineering, procurement, and construction for the floating offshore facility to be deployed in the Rosebank oil & gas field, 175 km northwest of the Shetland Islands.

The 99,750-tonne turret moored FPSO is scheduled to be handed over by the end of November 2016. It will be able to produce 100,000 barrels of oil and 190 million standard cubic feet of natural gas per day. It will also have storage capacity for 1.05 million barrels of oil.

The FPSO, measuring 292 m in length, 57 m in width, and 30 m in depth, will be built under the NORSOK standard, applicable to offshore facilities operating in the harsh conditions of the North Sea. Currently, the Ulsan, South Korea-based offshore facilities contractor is building two other FPSO and one offshore platform specially designed to perform in the North Sea.

The shipbuilders say that this brings their new orders for this year to US$-5.1 billion, which is 85% of their US$ 6-billion annual target.

 

Logistics News

Australian Authorities Seize Cocaine from Shipping Container

Australian Authorities Seize Cocaine from Shipping Container

Container Freight Rates Could Plunge with End of Houthi Attacks

Container Freight Rates Could Plunge with End of Houthi Attacks

McDonald Appointed ABS Chairman, CEO

McDonald Appointed ABS Chairman, CEO

Advanced Polymer Coatings Clinches Two Tanker Deal with Asyad Shipping Company

Advanced Polymer Coatings Clinches Two Tanker Deal with Asyad Shipping Company

Subscribe for Maritime Logistics Professional E‑News

Discussions are underway about the airport project in Moldova with Lukoil, a Russian oil company
US Airlines cancel 1,200 flights on Tuesday due to the government shutdown
Boeing maintains strong delivery pace throughout October