Kiswire’s New Plant for Offshore Ropes

January 28, 2010

Kiswire is building a new plant for the production of very large wire ropes for Offshore and Mining applications. The Neptune 2 plant is located in Tanjung Langsat, on the sea coast in Johor, Malaysia and will be operational autumn 2011. The equipment installed is capable of manufacturing wire rope units of 600 metric tons in non rotating, multi strand constructions. Furthermore, six strand wire rope units of 300 tons and eight strand units of 400 tons shall be produced in this factory. The output capacity of Neptune 2 will be 35,000 metric tonnes per annum. This number comes in addition of the existing Neptune 1 plant output of 25,000 tonnes each year.

(www.kiswire.com)

Logistics News

Epstein Files Brings Down DP World Boss

Epstein Files Brings Down DP World Boss

Port Attack Near Odesa Kills Three Brothers

Port Attack Near Odesa Kills Three Brothers

India OKs Ag Exports to Placate Farmers

India OKs Ag Exports to Placate Farmers

$1.2B Invested in German Terminal Upgrade

Subscribe for Maritime Logistics Professional E‑News

Journalist Don Lemon pleads Not Guilty in Minnesota ICE Protest Case
FAA lifts restrictions on airspace over southern New Mexico
Latest suspected sabotage attacks during the Olympics cause delays in Italy