Kiswire’s New Plant for Offshore Ropes

January 28, 2010

Kiswire is building a new plant for the production of very large wire ropes for Offshore and Mining applications. The Neptune 2 plant is located in Tanjung Langsat, on the sea coast in Johor, Malaysia and will be operational autumn 2011. The equipment installed is capable of manufacturing wire rope units of 600 metric tons in non rotating, multi strand constructions. Furthermore, six strand wire rope units of 300 tons and eight strand units of 400 tons shall be produced in this factory. The output capacity of Neptune 2 will be 35,000 metric tonnes per annum. This number comes in addition of the existing Neptune 1 plant output of 25,000 tonnes each year.

(www.kiswire.com)

Logistics News

Baltic Index Drops to Four Week Low

Baltic Index Drops to Four Week Low

HD Hyundai to Supply Four Port Cranes to Tacoma

HD Hyundai to Supply Four Port Cranes to Tacoma

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

DP World Completes Dredging Milestone for Senegalese Container Port

DP World Completes Dredging Milestone for Senegalese Container Port

Subscribe for Maritime Logistics Professional E‑News

Bombardier's free cash flow turns positive with stronger private jet orders
London insurers expand high-risk Red Sea zone following Houthi attacks
Italy's beach access dispute pits campaigners against lido operators