marine link image
Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

Ferry Repairs Disrupt San Juan Islands Service

January 13, 2010

Repairs to the 90-car Sealth continue after damage to the vessel’s engine output shaft was discovered on Tuesday, Jan. 5. Engineers estimate that the vessel will be ready to return to service by the end of the week of Jan. 11, after repairs and sea trials are completed.

The Sealth was brought to WSF’s Eagle Harbor Maintenance Facility on Bainbridge Island last Wednesday, Jan. 6, and engineers determined that extensive repairs would be required. WSF sent its only backup vessel, the 34-car Hiyu, to serve as the inter-island vessel in the San Juans beginning Thursday, Jan. 7.

The 87-car Evergreen State is serving in place of the Sealth in the mornings. Customers should expect delays of 25 to 40 minutes mid-morning, due to the Evergreen State’s slower operating speed (13 knots versus 16 to 18 knots for the Sealth and the other Issaquah Class vessels). The 144-car Kaleetan serves in place of the Sealth on the afternoon sailings Monday through Thursday.

Crews have identified the repairs needed on the Sealth, obtained the parts, and are now performing the repairs. WSF engineers have also been working with a third party shafting/alignment specialist to identify the root cause of the damage and determine steps to take to prevent any reoccurrence.

WSF anticipates the repairs will be completed before the end of this week; however, the vessel will require extensive sea trials of up to eight hours to prove the repairs are satisfactory prior to returning vessel to operation.

To sign up for free e-mail alerts about service disruptions and other route information, visit: www.wsdot.wa.gov/ferries/email_alerts
 

Logistics News

Seaborne Grain Exports from Russia Drop 62% in September

Seaborne Grain Exports from Russia Drop 62% in September

Shipping Through Constanta Port Stabilizes After Black Sea Attacks

Shipping Through Constanta Port Stabilizes After Black Sea Attacks

Next Phase Begins on Tampa Harbor Navigation Improvement Project

Next Phase Begins on Tampa Harbor Navigation Improvement Project

DP World Launches Two New Dedicated Freight Corridors Across India

DP World Launches Two New Dedicated Freight Corridors Across India

Subscribe for Maritime Logistics Professional E‑News

Manishi Raymondchaudhuri: The thaw in the Sino-Indian relationship will be a major test for economic growth
US FAA: Boeing 737 MAX software bug poses no safety concern
Increased security at US Fairford Air Base in England