Norfolk Harbor Channel Dredging

September 8, 2009

The Navy announced on September 8 its decision to deepen approximately five miles of the Norfolk Harbor Channel in the Elizabeth River.  This action will allow the continuous safe and expeditious travel of aircraft carriers to and from the Norfolk Naval Shipyard (NNSY) and the Lamberts Point Deperming Station. 
 
Dredging this heavily-used waterway, which is the federal navigation channel within the Elizabeth River in Norfolk, Portsmouth, and Chesapeake, would occur from the Lamberts Point Deperming Station in the Lamberts Bend Reach, south to NNSY in the Lower Reach.  Dredging would occur completely within the existing Army Corps of Engineers-maintained federal navigation channel.
 
The action is necessary because currently there is not enough space between the keel of transiting aircraft carriers and the bottom of the channel.  This causes mud and other debris from the river bottom to be drawn into the engine cooling and firefighting systems, creating the potential for engine damage, costly delays, and unsafe conditions.
 
To avoid these conditions, aircraft carrier movements into and out of the deperming station and NNSY are now limited to high tide periods.  These conditions must be alleviated in order for the Navy to meet the requirement of maintaining the combat readiness of its nuclear-powered aircraft carriers, and effectively and efficiently perform its national defense mission.
 
The Navy's decision conforms to the process outlined in the National Environmental Protection Act, which requires analysis of the environmental consequences of federal actions.  The Navy consulted with state and federal regulatory agencies throughout the environmental impact statement (EIS) process, including the U.S. Fish and Wildlife Service, the National Marine Fisheries Service, the Virginia Department of Environmental Quality, and the Virginia Department of Historic Resources.  The U.S. Army Corps of Engineers was a cooperating agency in this EIS.

Logistics News

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Syria Signs New 30-Year Deal with CMA CGM

Syria Signs New 30-Year Deal with CMA CGM

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Subscribe for Maritime Logistics Professional E‑News

Turkey maintains its commitment to the contested "Kanal Istanbul" project
Equinor anticipates a tight European summer gas supply
South Korea's NOFI purchases about 65,000 T of feed wheat, traders claim