Italy's New FLNG Terminal to Be Operational by March 2025

July 12, 2024

(Photo: BW Group)
(Photo: BW Group)

Italy's gas grid group Snam SRG.MI said on Friday it expected a new liquefied natural gas (LNG) terminal to become operational by March 2025, allowing the country to diversify further its energy supplies.

The floating terminal in the Adriatic sea will have an annual regasification potential of 5 billion cubic metres (bcm), bringing Italy's total capacity to 28 bcm a year, or 45% of the country's gas demand in 2023.

The set up of the regasification unit dubbed BW Singapore, which envisages the building of both a platform offshore the costal city of Ravenna and a breakwater, is part of Italy's effort to replace Russian gas imports.

Snam said last year it would invest a total of around 1 billion euros ($1.1 billion) to buy and complete construction works for the energy infrastructure.

In a statement issued after an event in Ravenna, Snam said contracts worth around 300 million euros related to the new terminal had been awarded to local groups, with a positive effect on the regional economy.


($1 = 0.9177 euros)

(Reporting by Francesca Landini; Editing by Louise Heavens)

Logistics News

CMA CGM Q1 Resilient, but Shipping Margins Tighten Amid Geopolitical Turbulence

CMA CGM Q1 Resilient, but Shipping Margins Tighten Amid Geopolitical Turbulence

EU Temporarily Suspends Fertilizer Duties Amidst Hormuz Crisis

EU Temporarily Suspends Fertilizer Duties Amidst Hormuz Crisis

Syria, CMA CGM to Operate Two Dry Ports

Syria, CMA CGM to Operate Two Dry Ports

Jon Oakey, Retired Port of Aberdeen CFO, Wins Finance Lifetime Achievement Award

Jon Oakey, Retired Port of Aberdeen CFO, Wins Finance Lifetime Achievement Award

Subscribe for Maritime Logistics Professional E‑News

French and Benelux stocks: Factors to watch for on May 22
UAE equity gains as oil rallies due to US-Iran uncertainty
Kenyan public transport operators end their strike after the government reduces diesel prices