Italy's New FLNG Terminal to Be Operational by March 2025

July 12, 2024

(Photo: BW Group)
(Photo: BW Group)

Italy's gas grid group Snam SRG.MI said on Friday it expected a new liquefied natural gas (LNG) terminal to become operational by March 2025, allowing the country to diversify further its energy supplies.

The floating terminal in the Adriatic sea will have an annual regasification potential of 5 billion cubic metres (bcm), bringing Italy's total capacity to 28 bcm a year, or 45% of the country's gas demand in 2023.

The set up of the regasification unit dubbed BW Singapore, which envisages the building of both a platform offshore the costal city of Ravenna and a breakwater, is part of Italy's effort to replace Russian gas imports.

Snam said last year it would invest a total of around 1 billion euros ($1.1 billion) to buy and complete construction works for the energy infrastructure.

In a statement issued after an event in Ravenna, Snam said contracts worth around 300 million euros related to the new terminal had been awarded to local groups, with a positive effect on the regional economy.


($1 = 0.9177 euros)

(Reporting by Francesca Landini; Editing by Louise Heavens)

Logistics News

Hormuz Disruption Drives Panama Canal Transits

Hormuz Disruption Drives Panama Canal Transits

Jotun's Hull Skating Solutions Receives DNV Verification

Jotun's Hull Skating Solutions Receives DNV Verification

Rio Tinto Ships Eight Billionth Tonne of Iron Ore from the Pilbara

Rio Tinto Ships Eight Billionth Tonne of Iron Ore from the Pilbara

Third VLCC Exits Strait of Hormuz

Third VLCC Exits Strait of Hormuz

Subscribe for Maritime Logistics Professional E‑News

Germany invests in shelters for everyday use, moving away from Cold War bunkers
Maguire: Texas cuts gas consumption as ERCOT clean energy momentum continues to grow
US invests another $200 Million for rebuilding New York Penn Station