Chilean Port Inspections - International Vessels Arriving from Ecuador

June 16, 2016

The Chilean Agriculture Service is warning of inspections for all international vessels arriving direct from Ecuador following latest detections in Chilean ports of the brown moth, Thyrinteina arnobia (Lagarta Eucalyptus).

Following the advice, ISS Chile is warning of potential delays for vessels arriving in Chile from Ecuador.


The Chilean Agriculture Service has advised it will be carrying out the following inspections:

  1. Conduct a specific daylight inspection during the inward clearance of all ships that have called at Ecuador. The inspection will be done if the vessel has come from abroad or another Chilean port.
  2. If there is a positive detection of the pest, vessel clearance will be rejected and Effective Resolution 1984/2000 will be executed (the vessel will not be allowed to operate at port until fumigation and new inspection are completed).
  3. Following phytosanitary treatment, a further inspection will take place to check for total removal of eggs from the vessel deck. Should no live pest eggs be found, Free Pratique will be granted (authorisation from port authorities to enter and perform all operations inside the port of call), as long as the cargo offloading is flagged to the respective Customs Checkpoints Unit beforehand for daylight audit.
  4. An agriculture (SAG) inspector will check cargo condition on the vessel’s quay during daylight hours. Should presence of the pests be found during cargo offloading, appropriate measures will be taken and a treatment order will be issued at least for the inspected cargo, according to Effective Resolution 1984/2000. If pests are found during cargo offloading, operations will be stopped, fumigation will be require and a new inspection will be needed before authorization to continue commercial operations.

Logistics News

Maersk’s 2025 Report: Some Records and Some Lay Offs

Maersk’s 2025 Report: Some Records and Some Lay Offs

Panama President: Future Port Contracts Will Not Be Issued to a Single Operator

Panama President: Future Port Contracts Will Not Be Issued to a Single Operator

Cuba-Related Tanker Loads Gas Cargo in Venezuela

Cuba-Related Tanker Loads Gas Cargo in Venezuela

2027 Set as Operational Start of Petronor E-Fuels Plant at Port of Bilbao

2027 Set as Operational Start of Petronor E-Fuels Plant at Port of Bilbao

Subscribe for Maritime Logistics Professional E‑News

China's Aerospace Times Feipeng expands globally amid fierce drone competition
Vietjet and Pratt & Whitney sign deal for 44 engines that will power Airbus jets
US Judge to hold Friday hearing in suit for restoration of New York Tunnel funding