OBS: Reduced Ballast Water Holding Time

March 4, 2019

Photo: OBS
Photo: OBS

Optimarin Ballast Systems (OBS) have gained approval from the United States Coast Guard (USCG) slashing their required holding time from 72 to just 24 hours for all salinities. The certification ensures the systems are optimized for short sea shipping routes in the US, as the time between ballast water treatment (BWT) and de-ballasting is cut dramatically.

USCG requires a holding time post treatment for environmentally friendly UV systems. This is to ensure all cells are inactive before testing. 

However, with increased UV doses, such as those provided by OBS’ powerful 35kW lamps, the holding time can be reduced, thus enabling greater vessel flexibility.

Logistics News

European Wheat Prices Jump to 17-Month High Amidst Renewed Black Sea Tensions

European Wheat Prices Jump to 17-Month High Amidst Renewed Black Sea Tensions

Ukraine to Protect Ports, Exports After Recent Russian Attacks

Ukraine to Protect Ports, Exports After Recent Russian Attacks

Port of Aberdeen Welcomes Longest-Ever Vessel

Port of Aberdeen Welcomes Longest-Ever Vessel

Sogese H2 Market Update Foreshadows Geopolitical Impact on Global Shipping

Sogese H2 Market Update Foreshadows Geopolitical Impact on Global Shipping

Subscribe for Maritime Logistics Professional E‑News

Airbus and Boeing fly parts to the giant Antonov plane to ease supply problems
The White House is considering extending Jones Act waivers in light of the Iran conflict and price concerns
The wife of a Ryanair passenger who was partially sucked from the plane window recalls an incident