EPA' Issue Final Draft Ballast Water VGP

April 7, 2013

The US EPA release the Final Draft of the Vessel General Permit (VGP) which comes in to force 19 December 2013.

The aim of the National Pollutant Discharge Elimination System's (NPDES) 2013 Vessel General Permit (VGP) is to protect the nation's waters from ship-borne pollutants and reduce invasive species. It covers commercial vessels longer than 79 feet, excluding military and recreational vessels, and will replace the 2008 vessel general permit that expires on 19 December
2013.

The new permit includes a stricter numeric discharge standard limiting the release of non-indigenous invasive species in ballast water. It also contains additional environmental protection for the Great Lakes, requiring certain vessels to take additional precautions.

The 2013 final VGP seeks to reduce the administrative burden for vesselowners and operators by eliminating duplicate reporting requirements, expanding electronic record-keeping opportunities, and reducing self-inspection frequency for vessels that are out of service for extended periods.

The new discharge standards are in line with the International MaritimeOrganisation's 2004 Ballast Water Convention.

More information can be found here.
 

Logistics News

Oil Loading in Venezuela Crawls After New US Interceptions

Oil Loading in Venezuela Crawls After New US Interceptions

FMC Investigates Spain’s Restrictive Port Practices

FMC Investigates Spain’s Restrictive Port Practices

Baku Port Handles 37% More Containers in 2025

Baku Port Handles 37% More Containers in 2025

International Flag-State Association Looks to Advancing Role in Policymaking

International Flag-State Association Looks to Advancing Role in Policymaking

Subscribe for Maritime Logistics Professional E‑News

Germany deports criminals to Syria amid pressure on migration
Repairs at CPC Terminal continue, despite a steady decline in Urals.
Oil prices steady as the market balances geopolitical risk against fundamentals that are bearish