EPA' Issue Final Draft Ballast Water VGP

April 7, 2013

The US EPA release the Final Draft of the Vessel General Permit (VGP) which comes in to force 19 December 2013.

The aim of the National Pollutant Discharge Elimination System's (NPDES) 2013 Vessel General Permit (VGP) is to protect the nation's waters from ship-borne pollutants and reduce invasive species. It covers commercial vessels longer than 79 feet, excluding military and recreational vessels, and will replace the 2008 vessel general permit that expires on 19 December
2013.

The new permit includes a stricter numeric discharge standard limiting the release of non-indigenous invasive species in ballast water. It also contains additional environmental protection for the Great Lakes, requiring certain vessels to take additional precautions.

The 2013 final VGP seeks to reduce the administrative burden for vesselowners and operators by eliminating duplicate reporting requirements, expanding electronic record-keeping opportunities, and reducing self-inspection frequency for vessels that are out of service for extended periods.

The new discharge standards are in line with the International MaritimeOrganisation's 2004 Ballast Water Convention.

More information can be found here.
 

Logistics News

ASEAN Looks to Deepen Trade Ties with China

ASEAN Looks to Deepen Trade Ties with China

UK’s First Electric Shipping Routes Set to Slash Irish Sea Emissions

UK’s First Electric Shipping Routes Set to Slash Irish Sea Emissions

Port of Sunderland Selects PicoMB Multibeam Technology for Port Surveys

Port of Sunderland Selects PicoMB Multibeam Technology for Port Surveys

Puerto Rico Inks LNG Contract with New Fortress Energy

Puerto Rico Inks LNG Contract with New Fortress Energy

Subscribe for Maritime Logistics Professional E‑News

Oil prices remain stable as markets wait for Fed rate decision
Frontier Airlines CEO: Ultra-low-cost model "alive and well"
Oil prices drop on US demand fears ahead of Fed rate decision