EPA' Issue Final Draft Ballast Water VGP

April 7, 2013

The US EPA release the Final Draft of the Vessel General Permit (VGP) which comes in to force 19 December 2013.

The aim of the National Pollutant Discharge Elimination System's (NPDES) 2013 Vessel General Permit (VGP) is to protect the nation's waters from ship-borne pollutants and reduce invasive species. It covers commercial vessels longer than 79 feet, excluding military and recreational vessels, and will replace the 2008 vessel general permit that expires on 19 December
2013.

The new permit includes a stricter numeric discharge standard limiting the release of non-indigenous invasive species in ballast water. It also contains additional environmental protection for the Great Lakes, requiring certain vessels to take additional precautions.

The 2013 final VGP seeks to reduce the administrative burden for vesselowners and operators by eliminating duplicate reporting requirements, expanding electronic record-keeping opportunities, and reducing self-inspection frequency for vessels that are out of service for extended periods.

The new discharge standards are in line with the International MaritimeOrganisation's 2004 Ballast Water Convention.

More information can be found here.
 

Logistics News

Marine Fuel Sales at Fujairah Port Hit Three-Month Low

Marine Fuel Sales at Fujairah Port Hit Three-Month Low

ContainerWheels 2-in-1: Patented System Aims to Simplify Container Handling

ContainerWheels 2-in-1: Patented System Aims to Simplify Container Handling

Shipbuilding: ONE Singapore Joins the Fleet

Shipbuilding: ONE Singapore Joins the Fleet

Cavotec Launches Mobile Shore Power System

Cavotec Launches Mobile Shore Power System

Subscribe for Maritime Logistics Professional E‑News

Trump says he wants to'real-end' the nuclear problem with Iran
Sources: Airbus is close to a deal with VietJet for 100 A321 aircraft
Mitsui OSK CEO: Shipping in Gulf is continuing, and we are closely monitoring the situation