Cape Cod Canal Remains Closed

January 30, 2014

Massachusetts’ Cape Cod Canal will remain closed daily from 7 a.m. to 5 p.m. through Friday, February 7, 2014 to permit maintenance work on the vertical life railroad bridge across the canal. The Canal may be open on Saturday, February 1 and/or Sunday, February 2 if repair operations permit.

A bulletin on January 14 originally announced that the Cape Cod Canal would resume normal operations on January 31, but unavoidable delays prolonged maintenance work.
 

Logistics News

Seeing the Ship as a System Changes Everything

Seeing the Ship as a System Changes Everything

Rear Adm. Philip Sobeck: MSC Needs More Mariners, New Ships

Rear Adm. Philip Sobeck: MSC Needs More Mariners, New Ships

America's Ports to Reduce Air Pollution with $150 Million Grant

America's Ports to Reduce Air Pollution with $150 Million Grant

Energy Transition: LNG Prices Plummet, Dual-fuel LNG Newbuilds Rise

Energy Transition: LNG Prices Plummet, Dual-fuel LNG Newbuilds Rise

Subscribe for Maritime Logistics Professional E‑News