Cape Cod Canal Remains Closed

January 30, 2014

Massachusetts’ Cape Cod Canal will remain closed daily from 7 a.m. to 5 p.m. through Friday, February 7, 2014 to permit maintenance work on the vertical life railroad bridge across the canal. The Canal may be open on Saturday, February 1 and/or Sunday, February 2 if repair operations permit.

A bulletin on January 14 originally announced that the Cape Cod Canal would resume normal operations on January 31, but unavoidable delays prolonged maintenance work.
 

Logistics News

Bulk Carrier on Fire After Russian Attack

Bulk Carrier on Fire After Russian Attack

Brazil to Auction Santos Container Terminal in Early March

Brazil to Auction Santos Container Terminal in Early March

California Ports Elect Dr. Noel Hacegaba as New President

California Ports Elect Dr. Noel Hacegaba as New President

IMO Challenged Over Livestock Carrier Regulations

IMO Challenged Over Livestock Carrier Regulations

Subscribe for Maritime Logistics Professional E‑News

Volvo Cars urges EU to resist pressure to scrap fossil-fuel autos ban
Ukraine strikes Russian oil infrastructure on the Caspian Sea for a second time
EU to charge 3 Euros Duty on E-Commerce Parcels from July 2026