Konecranes Wins $46 mln USN Crane Deal

December 18, 2019

US Navy has contracted Konecranes to deliver a 175-ton portal jib crane to the Puget Sound Naval Shipyard in the State of Washington. 

The $46-million order was booked in December and contains options for six additional portal jib cranes over the next seven years. If realized, the total value of the agreement would be around $330 million.

The crane to be provided is a Konecranes tailor-made design, unique with features that allow it to operate on the multiple rail section sizes, straight or curved, located at the Naval base. The portal jib crane is also designed to minimize wheel loads while operating at maximum capacity through the maximum operating range with Konecranes’ unique dynamic stability system.

This design of crane is tailored to the historical shipyard layouts of the US Navy, but could be used globally in other Naval shipyards with similar configurations.



Logistics News

188 Merchant Marine, Military Officers Graduate from USMMA

188 Merchant Marine, Military Officers Graduate from USMMA

Congressman Suozzi Delivers Keynote at Webb Graduation

Congressman Suozzi Delivers Keynote at Webb Graduation

International Chamber of Shipping Appoints John Denholm as Chairman of the Board

International Chamber of Shipping Appoints John Denholm as Chairman of the Board

DP World Cochin Sees Highest Monthly Throughput in May

DP World Cochin Sees Highest Monthly Throughput in May

Subscribe for Maritime Logistics Professional E‑News

Heatwave in the UK breaks June records
Heatwave to spread across the UK, breaking June records
US FAA selects ASI to overhaul software for improved flight schedules and reduced delays