GTT to Design LNG Tanks for Korean Shipyard

January 3, 2018

 GTT received at the end of 2017 an order from a South Korean shipyard regarding the design of the LNG tanks of a new LNG carrier. Its delivery is scheduled for the first quarter of 2020.

 
GTT will design the LNG tanks of the unit, allowing for a capacity of 174,000 m3. The insulation solution Mark III Flex has been chosen for its ability to reduce the daily guaranteed Boil-Off gas rate to 0.085% of tank volume. 48 vessels in service already benefit from this technology.
 
The shipowner and shipyard's names are kept confidential at this stage. 
 
Last month, GTT received an order from a South Korean shipyard regarding the design of the LNG tanks of 3 new LNG carriers. The deliveries are due in the first semester of 2020.
 
GTT will design the LNG tanks of the units, each having a capacity of 174,000 m3. The tanks will be equipped with the membrane containment system Mark III Flex, a sea-proven technology developed by GTT. This insulation system guarantees a Boil-Off Rate of 0.085%V/day. It has already been used to equip 48 vessels in service today.
 

Logistics News

CSP Iberian Bilbao Terminal Receives STS Crane

CSP Iberian Bilbao Terminal Receives STS Crane

C&C Marine and Repair's Robotic Blast Facility Completes 700 Barges

C&C Marine and Repair's Robotic Blast Facility Completes 700 Barges

Mooreast to Divest Property, Boost Offshore Wind Expansion

Mooreast to Divest Property, Boost Offshore Wind Expansion

ADNOC LNG Tanker Crosses Strait of Hormuz

ADNOC LNG Tanker Crosses Strait of Hormuz

Subscribe for Maritime Logistics Professional E‑News

Rio Grande extends its LNG facility construction in Texas for three years
Maguire: China's clean technology exporters are cashing in on the Iran war, which has affected oil and gas flows.
Environmentalists from the Western Balkans demand renewable energy over US gas projects