Court Rejects Claim against Surveyor Accused of Poor Stowage

April 4, 2016

The wording of instructions can potentially widen the scope of liability for marine service providers, warned International Transport Intermediaries Club (ITIC), citing the recent case of a marine surveyor sued for €1.56 million for alleged poor onboard stowage of a cargo.
 
The marine surveyor in Germany was engaged by charterers to attend the loading of a cargo and to report on any damage caused by the stevedores. The emailed instructions from the charterer contained the following provisions:
 
“We hereby order the following: supervision of the loading/preloading survey; reporting of eventual damages to the coating or the material - and time of damage; reporting of negligence while handling the material and loading; detailed documentation, with photos, of the loading operations; no continuous supervision will be necessary, only during the important moments (commencement of loading operations - change of shift – securing of the cargo).”
 
Loading and lashing of the cargo was completed and the vessel sailed. Three days later there was a loud noise from the cargo hold and the ship developed a 30-degree list. The master reduced the list by ballasting and diverted to a port of refuge. The cargo was discharged, sorted on the quay, reloaded, lashed and secured. About 600 metric tons of damaged cargo was left behind. Over 10 days later, the ship resumed its voyage.
 
The owners alleged that the cargo had shifted due to poor stowage, and ultimately obtained an arbitration award against the charterers for €1.56 million. The charterers subsequently held the surveyor and the stevedores who had loaded the cargo jointly liable for this amount.
 
Lawyers appointed by ITIC represented the surveyor at court, where the claim was subsequently rejected on the basis that the stevedores were responsible for the loading and stowage, and that the surveyor’s instructions were limited to reporting on stevedoring damage caused during loading. 
 
ITIC director Charlotte Kirk said, “The potential difficulty with this defense was that the charterer’s email instructions could have been interpreted as conferring a wider obligation. In the circumstances, it was agreed that the surveyor would make a contribution of approximately ten per cent to the settlement of the claim.”
 
“While this contribution was relatively modest in percentage terms, the claim is an example of how the wording of instructions can potentially widen the scope of a surveyor’s liabilities,” Kirk said. “If the brief is understood to be restricted to a specific task, it is important to make sure that this is clearly recorded.”

Logistics News

ClassNK, StormGeo Team on Maritime Decarbonization

ClassNK, StormGeo Team on Maritime Decarbonization

DFDS to Invest $1.2 Billion in Six Battery Electric Ship

DFDS to Invest $1.2 Billion in Six Battery Electric Ship

Methanol-Fueled Tugboat Launched

Methanol-Fueled Tugboat Launched

Marlink Expands Global Service Support Network

Marlink Expands Global Service Support Network

Subscribe for Maritime Logistics Professional E‑News