marine link image

Boskalis Inks EUR 300 mi Fehmarnbelt Project Deal

May 31, 2016

Today, Femern A/S, a subsidiary of the Danish state-owned Sund & Bælt Holding A/S, and the Fehmarn Belt Contractors joint venture, consisting of Royal Boskalis Westminster N.V. (Boskalis) and Van Oord, signed the previously announced contract related to the construction of the Fehmarnbelt Fixed Link. Boskalis' share of the contract is approximately EUR 300 million.
 
The contract is conditional to obtaining the outstanding environmental permits that have yet to be issued by the German authorities.
 
The Fehmarnbelt Fixed Link will connect Denmark and Germany and will be the world's longest immersed road and rail tunnel with a length of more than 18 kilometers. The activity scope for Boskalis together with Van Oord includes the dredging of a tunnel trench in the seabed over a distance of 16 kilometers. The dredged material will be reused to create a new recreational nature reserve area on the Danish side of the Fehmarnbelt. The joint venture will also construct a new working harbor where the tunnel contractors will construct a tunnel fabrication yard where the tunnel sections will be cast before being floated out to sea for installation.
 

Logistics News

Russian Oil Producers Threaten Force Majeure Over Baltic Port Attacks

Russian Oil Producers Threaten Force Majeure Over Baltic Port Attacks

BIMCO: 130 Container Ships Stranded in Persian Gulf

BIMCO: 130 Container Ships Stranded in Persian Gulf

Hapag-Lloyd Earnings Down from Last Year

Hapag-Lloyd Earnings Down from Last Year

Transneft Looks to Redirect Oil From Attacked Baltic Ports

Transneft Looks to Redirect Oil From Attacked Baltic Ports

Subscribe for Maritime Logistics Professional E‑News

WTO is at a 'critical junction' and requires deep reforms, EU and CPTPP claim
Kazakhstan claims that the attack on Ust-Luga did not impact its oil exports
UN Aviation Agency limits the use of power banks on flights to two per passenger