Angola's Soyo LNG Plant Resumes Production

December 18, 2018

© Anatoly Kolodey / Adobe Stock
© Anatoly Kolodey / Adobe Stock

Angola's Soyo liquefied natural gas (LNG) plant has resumed production after a "controlled" shutdown, a spokeswoman for Angola LNG said on Tuesday.

She did not specify why the shutdown had occurred and declined to say when the plant would load its first cargo after reopening.

An LNG trader in Europe said a cargo is expected in late December or early January.

Two Angola LNG vessels are signalling arrival at Soyo, Refinitiv Eikon shipping data showed. The Sonangol Etosha is expected at Soyo on Dec. 28 and the Sonangol Sambizanga on Jan. 5.

Previously, industry sources said the Soyo plant had been shut since last week, with one or two cargoes affected by the maintenance.

Angola LNG has not issued a sell tender so far in December, previously holding tenders every one or two weeks.


(Reporting by Ekaterina Kravtsova; Editing by Dale Hudson and David Evans)

Logistics News

Green Shipping Service Launched in Singapore

Green Shipping Service Launched in Singapore

Tuapse Port Fire Extinguished Days After Ukrainian Drone Attack

Tuapse Port Fire Extinguished Days After Ukrainian Drone Attack

Port of Antwerp-Bruges Reports Weak Start to the Year

Port of Antwerp-Bruges Reports Weak Start to the Year

Hydrogen Fuel Cell Harbor Craft Pilot Study Launched in Singapore

Hydrogen Fuel Cell Harbor Craft Pilot Study Launched in Singapore

Subscribe for Maritime Logistics Professional E‑News

IFM Global Infrastructure Fund makes an offer to purchase Atlas Arteria for $4.9 billion.
Spain urges you to buy airline tickets as the Iran war increases oil prices
United Airlines abandons merger talks with American Airlines following rejection of their merger proposal