SBM Offshore and Petrobras have signed an agreement to study the application of carbon capture modules on floating production, storage, and offloading (FPSO) units.The module design is based on an engineering and design study between SBM Offshore and Mitsubishi Heavy Industries (MHI)…
INEOS selected ITT’s Svanehøj to supply CO₂ pumps for the onshore facility and the first LCO₂ carrier for Project Greensand in the Danish North Sea. This strategically significant order further strengthens Svanehøj’s position in carbon capture and storage (CCS)…
Van Oord’s heavy lift installation vessel Svanen has installed the first monopile at the Baltic Power offshore wind farm, north of the Polish coast.Developers ORLEN and Northland Power contracted Van Oord for the transport and installation of 78 foundations…