Upgrade Packages Ordered for Odfjell Tankers

June 7, 2015

 

Fuel-saving upgrade package with Kappel technology to optimise propulsion efficiency and lower fuel consumption of 11 vessels

MAN Diesel & Turbo’s Propeller & Aft Ship organisation has won an order to retrofit and upgrade a series of 11 × 37,500 dwt vessels from the Odfjell chemical tanker fleet. The vessels are of the Kværner Class and are due to dock during 2015-17, at which time the upgrades will be implemented. The first vessel, ‘M/T Bow Clipper’, will dock and be upgraded in August 2015.

Each vessel has an MAN B&W two-stroke engine powering a four-bladed, controllable-pitch propeller and a PTO-driven shaft alternator. The vessels’ new service speed at reduced main-engine output – combined with the implementation of MAN’s highly-efficient Kappel propeller blades, a fairing cone and a pre-fabricated rudder bulb kit – will all contribute to power savings and reduced exhaust-gas emissions.
The Kappel blades, fairing cone and rudder bulb are designed and customised for the tanker’s hull and rudder designs. The calculated power saving has been verified by tank-test analyses at MARINTEK (Norwegian Marine Technology Research Institute) as reported in preliminary results.

“It’s a very exciting project and we are proud to be part of it. With our new design possibilities, we are furthermore looking forward to offering this fuel-saving concept to other fleets with similar operational patterns,” said Kjartan Ross, Business Development Manager of MAN Diesel & Turbo’s Propeller & Aft Ship organisation. He continued: “With the long lifetime expectancy of Odfjell’s high value, quality vessels, this upgrade investment is straightforward and very attractive”.

Front runner

As technological front-runners, Odfjell embarked on the ambitious Kværner Class newbuilding programme of 37,500 dwt ships with 52 fully-segregated stainless-steel tanks and piping systems in 1991. The first such vessel was delivered in 1994 and the new series was packed with new technology: controllable pitch propellers, shaft alternators on main engines, bow thrusters, fixed tank-cleaning machines and radar positioned in each tank to gauge ullage. Odfjell was also a pioneer within the area of fully computer-controlled engines. The last ship in the series, ‘M/T Bow Firda’, was delivered in 2003 and has a main engine – an MAN B&W 7S50ME-C type – with electronically controlled timing and no camshaft – a world first.

The following Kværner Class vessels are currently scheduled for upgrade: Bow Flower, Bow Clipper, Bow Fortune, Bow Cecil, Bow Flora, Bow Cardinal, Bow Faith, Bow Cedar, Bow Fagus, Bow Chain and Bow Firda.

Logistics News

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Syria Signs New 30-Year Deal with CMA CGM

Syria Signs New 30-Year Deal with CMA CGM

Subscribe for Maritime Logistics Professional E‑News

Equinor anticipates a tight European summer gas supply
Turkey maintains its commitment to the contested "Kanal Istanbul" project
Ukraine's farm exports fell 23% month-on-month in April, according to lobby.