Teekay’s 1st Arctic LNG Carrier Completes Trial

November 12, 2017

Teekay LNG Partners said its first icebreaker liquefied natural gas (LNG) carrier newbuild, Eduard Toll, recently completed gas trials. 

 
Eduard Toll is Teekay’s first of six 172,000 cubic meter ARC7 LNG carrier newbuildings to be constructed for the Yamal LNG project. 
 
The ARC 7 LNG carrier was launched in January this year at the South Korean Daewoo Shipbuilding & Marine Engineering (DSME) shipyard.
 
The vessel has been designed and built to perform year-round navigation through the Arctic and has the icebreaking ability allowing it to proceed through ice up to 2.1 m thick.
 
Yamal is expected to produce 16.5 million metric tons of LNG annually by 2019, which will require a total of 15 ARC7 icebreaker LNG carriers.

Logistics News

HD Hyundai to Supply Four Port Cranes to Tacoma

HD Hyundai to Supply Four Port Cranes to Tacoma

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

DP World Completes Dredging Milestone for Senegalese Container Port

DP World Completes Dredging Milestone for Senegalese Container Port

Vessel Sinks Week After Being Struck by Russian Fire

Vessel Sinks Week After Being Struck by Russian Fire

Subscribe for Maritime Logistics Professional E‑News

Sources say that China has been in contact with the Houthis of Yemen to allow ships to pass through the Red Sea.
Airbus A350 jets fly non-stop for 24 hours from Australia to France
Safran, a jet engine manufacturer, raises its targets after a record-breaking first-half profit