Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

New $1.2B Subsea Cables Factory Plan Set to Transform Port of Tyne

May 14, 2025

A CGI of the proposed facility (Credit: Port of Tyne)
A CGI of the proposed facility (Credit: Port of Tyne)

LS Eco Advanced Cables (LSEAC) has launched a five-week public consultation on its proposals to develop a high voltage cable production facility at the Port of Tyne for subsea electricity transmission, designed to transport clean energy generated by offshore wind onto UK shores.

While plans are at an early stage and still being finalized, total investment is expected to be approximately $1.2 billion (£923 million), which would put the North East at the heart of the UK’s clean energy transition.

This proposal would see a state-of-the-art facility to manufacture deep sea cables built on land within the Port of Tyne (South side, Tyne Dock). The industrial complex would include a series of buildings - including a manufacturing space, testing facilities and offices - situated around a 202-meter-tall tower where the cables would be stretched and sheathed before use.

The facility would lead to 500 direct jobs and a thousand more across the wider supply chain, including in high-skilled roles in engineering, the developer said.

The consultation runs from May 14 to June 18, and provides an opportunity for local communities, businesses and organizations to give their feedback on the proposed development before the final planning application is made to South Tyneside Council later this year.

Along with the North East Combined Authority and the Port of Tyne, LSEAC will work with the region’s schools, colleges and universities to provide training and re-training in the skills needed at the facility, ensuring generations of North East people benefit from the huge employment opportunities.

“At a time when the UK is moving ever-more-quickly to decarbonising its energy supply, now more than ever there is a huge need for the infrastructure underpinning that transition.

“We’re delighted as a joint venture to be proposing this facility for a sub-sea cable development – but we must make it sure it works for the local community. That’s why we deeply value the input of everyone in the area to this consultation and encourage people to share their views and shape the future of this project,” said Sangdon Lee, Director at LSEAC.

 “The proposed cable manufacturing facility is a huge generational employment opportunity for people in the North East and complements the region’s already impressive advanced manufacturing sector. It demonstrates the ability of the region to attract significant international investors to support the clean energy transition, with the Port of Tyne at its heart,” added Matt Beeton, CEO of the Port of Tyne.

Logistics News

Ships Trickle Through Strait of Hormuz

Ships Trickle Through Strait of Hormuz

Houston Ship Channel Trade Tonnage Climbs 16%

Houston Ship Channel Trade Tonnage Climbs 16%

China Ships First Large Cargo of Brazilian Sorghum

China Ships First Large Cargo of Brazilian Sorghum

Conoship Adds 40-MWh Battery-Electric Option to CIP3800 Coaster

Conoship Adds 40-MWh Battery-Electric Option to CIP3800 Coaster

Subscribe for Maritime Logistics Professional E‑News

US FTC is considering requiring disclosure of customized pricing
El Nino threatens to revive shipping concerns, prompting Brazil's port terminals to call for the dredging of Tapajos River
Exporters warn that delays could occur as Ivory Coast prepares for EU cocoa regulations