Spudding of Gierałtowice Well

November 18, 2014

 

San Leon Energy, the AIM listed company focused on oil and gas exploration in Europe and North Africa, announces that it has spudded the Gierałtowice well, which is the second well being drilled in the Karpaty area in Poland.

The Gierałtowice prospect is on the Bielsko-Biała concession in Karpaty and is targeting 4 Bcf of mid-case recoverable gas in two target reservoirs - the Upper Carboniferous sandstone being the primary target with the Lower Carboniferous limestone as a secondary target. San Leon Energy holds 60% and is operator of the concession, with PGNiG holding the remaining 40%.

The drilling of the well is expected to be completed in the next few weeks, with any well testing occurring immediately afterwards.
 

Logistics News

Port of Tuapse Resumes Fuel Exports After Two-Week Pause

Port of Tuapse Resumes Fuel Exports After Two-Week Pause

SGP Breaks Ground on Integrated Logistics Zone, Unveils Terminal Expansion

SGP Breaks Ground on Integrated Logistics Zone, Unveils Terminal Expansion

Singapore to Award Licences for Methanol Bunkering

Singapore to Award Licences for Methanol Bunkering

Ardmore Shipping Deploys SteelCorr AI Solution to Enhance Vessel Corrosion Monitoring

Ardmore Shipping Deploys SteelCorr AI Solution to Enhance Vessel Corrosion Monitoring

Subscribe for Maritime Logistics Professional E‑News

US copper exchange inventories hit all-time high
Britain introduces $2 billion package for EVs
US copper exchange inventories hit all-time high