NSRP Awards $3.3M for Shipbuilding R&D

February 28, 2014

The Executive Control Board of the National Shipbuilding Research Program (NSRP) has selected four major research and development projects for award, as part of the program's continuing mission to reduce costs associated with U. S. shipbuilding and ship repair. These new projects, valued at approximately $6.6 million in both Navy funding and industry cost share, were among those proposed in response to the August 2013 Research Announcement Project descriptions below:


High Mobility Manufacturing Robot (HMMR) for Ship Compartments

Robotic Technologies for Tennessee | Ingalls Shipbuilding | GD NASSCO | VT Halter | Miller Welding | Tennessee Tech University | MetaVision

Objective: Expanding upon the successfully completed Remote Climbing Robot and the current Mobile Robotic Manufacturing System, the objective of this project is to develop and demonstrate a High Mobility Manufacturing Robot capable of operating in ship compartments.


Provide Design for Maintenance Training to U.S. Ship Design and Shipbuilding Industry

Bollinger Shipyards |  Electric Boat | BAE Systems Southeast Shipyards | Marinette Marine | Hepinstall Consulting Group | Victoria Dlugokecki, P.E.. | Tedesco Consulting

Objective: To enable widespread dissemination and implementation of Design for Maintenance principles and the extensive ship repair best practices and cost deduction opportunities that were identified and developed through the Reduction of Total Ownership Costs Through Application of Design For Maintenance and Repair Methodologies Project.


Ship Knowledge Management

Electric Boat |Newport News Shipbuilding | Product Data Services | Siemens PLM | PMS 450 | PMS 39

Objective: To provide the capability for shipboard personnel to display and analyze the 3D product model of the as-designed conditions of the ship and to communicate any changes needed or changes made back to the design agent.


Flexible Infrastructure
Ingalls Shipbuilding | Hilti North America; Newport News Shipbuilding | National Technical Systems

Objective: To develop the requirements, plans and specific procedures, and conduct testing as required to qualify specific FI design elements for use on Navy surface combatants and amphibious assault ships.

 

Logistics News

DP World, Asian Terminals Inc. Invest $100M to Boost Capacity at Manila South Harbor

DP World, Asian Terminals Inc. Invest $100M to Boost Capacity at Manila South Harbor

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Subscribe for Maritime Logistics Professional E‑News

Stocks rise on positive jobs data and signs of trade tensions easing
Data and sources say that the last Chevron chartered vessel is returning oil cargo to Venezuela.
Heavy rains and strong winds hit Indian capital, killing four people.