Miller Boat Contract to Great Lakes Group

October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Logistics News

Port Everglades Contributes $48.3b in Economic Impact, 300,000 Jobs for Florida

Port Everglades Contributes $48.3b in Economic Impact, 300,000 Jobs for Florida

Report Details Four Ship Breakaways During Storm

Report Details Four Ship Breakaways During Storm

Consortium to Advance e-Fuel Green Corridor Between Brazil and Belgium

Consortium to Advance e-Fuel Green Corridor Between Brazil and Belgium

Panama Canal Reduces Maximum Vessel Draft for Neopanamax Locks

Panama Canal Reduces Maximum Vessel Draft for Neopanamax Locks

Subscribe for Maritime Logistics Professional E‑News

LSEG data indicates that Freeport LNG will take in more natgas Monday, after the train was shut down on Saturday.
LATAM Brasil reduces fuel cost plans and capacity plans, with cuts expected into the third quarter
Indian shares fall on Asia-wide selloff due to oil price spike