Miller Boat Contract to Great Lakes Group

October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Logistics News

The Expanding Shadow Fleet Poses a Growing Threat to Maritime Safety

The Expanding Shadow Fleet Poses a Growing Threat to Maritime Safety

New Global Benchmark Ranks Top Container Ports Worldwide

New Global Benchmark Ranks Top Container Ports Worldwide

Panama Strengthens Global Leadership in Maritime Safety, Regulation During the IMO Assembly

Panama Strengthens Global Leadership in Maritime Safety, Regulation During the IMO Assembly

NorthPort Boosts Capacity with Mobile Harbor Cranes

NorthPort Boosts Capacity with Mobile Harbor Cranes

Subscribe for Maritime Logistics Professional E‑News

Tesla expects Indian Model Y buyers to recoup a third of the price within 4-5 years
The man who drove into the crowd at Liverpool's soccer parade has pleaded guilty to 31 charges
Trafigura lawyers claim Gupta has a history of fraud prior to the alleged $600 Million nickel scam