Miller Boat Contract to Great Lakes Group

October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Logistics News

Contship Introduces First Electric Port Tractor into Operations

Contship Introduces First Electric Port Tractor into Operations

ABS, HD KSOE Collaborate for Digital Shipbuilding, Vessel Intelligence

ABS, HD KSOE Collaborate for Digital Shipbuilding, Vessel Intelligence

UTC Overseas, Transoceanic Launch US Gulf Coast Logistics Joint Venture

UTC Overseas, Transoceanic Launch US Gulf Coast Logistics Joint Venture

US Container Imports Fall 3.2% in April, Descartes Reports

US Container Imports Fall 3.2% in April, Descartes Reports

Subscribe for Maritime Logistics Professional E‑News

Africa-France Summit: New partnerships and deals on the menu
Swiss Air CEO says no immediate fuel shortage, eyes contingency plans
Airport says that a Frontier Jet hit and killed a pedestrian on the runway in Denver while taking off.