Miller Boat Contract to Great Lakes Group

October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Logistics News

UAE Ports Become Country's Lifeline as Gulf Trade Remains Fragile

UAE Ports Become Country's Lifeline as Gulf Trade Remains Fragile

Great Lakes Iron Ore Trade Increases 5.3% in April

Great Lakes Iron Ore Trade Increases 5.3% in April

DNV Alternative Fuels Insight: 38 New Vessel Orders Placed in April

DNV Alternative Fuels Insight: 38 New Vessel Orders Placed in April

At the Helm: How the U.S. Coast Guard is Shaping the Future of Maritime Nuclear Power

At the Helm: How the U.S. Coast Guard is Shaping the Future of Maritime Nuclear Power

Subscribe for Maritime Logistics Professional E‑News

Bild reports that a German woman aboard a ship infected with hantavirus will be tested by s German hospital.
South Korea suspends its review of Trump’s call for participation in 'Project Freedom.
CMA CGM Container Ship Hit in Strait of Hormuz injures crew