Miller Boat Contract to Great Lakes Group

October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Logistics News

Port of Antwerp-Bruges Reports Weak Start to the Year

Port of Antwerp-Bruges Reports Weak Start to the Year

Hydrogen Fuel Cell Harbor Craft Pilot Study Launched in Singapore

Hydrogen Fuel Cell Harbor Craft Pilot Study Launched in Singapore

BIMCO Warns of Hormuz Toll Scam

BIMCO Warns of Hormuz Toll Scam

HPH Trust Unveils Hong Kong’s First Autonomous Truck Fleet

HPH Trust Unveils Hong Kong’s First Autonomous Truck Fleet

Subscribe for Maritime Logistics Professional E‑News

French and Benelux stocks: Factors to watch
Geely Caocao will deploy thousands of robotaxis fully customized in 2027
NTSB: runway safety system was not active before fatal Air Canada Express crash