Miller Boat Contract to Great Lakes Group

October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Logistics News

Baltic Index Rises Alongside All Vessel Segments

Baltic Index Rises Alongside All Vessel Segments

Awake.Al, Tidalis Collaborate for Maritime Emissions Reporting

Awake.Al, Tidalis Collaborate for Maritime Emissions Reporting

Konecranes to Supply Two Cranes for Norwegian Oil Industry Facility

Konecranes to Supply Two Cranes for Norwegian Oil Industry Facility

EnergyPathways, ABP Partner on Energy Storage Project at Port of Barrow

EnergyPathways, ABP Partner on Energy Storage Project at Port of Barrow

Subscribe for Maritime Logistics Professional E‑News

Gulf crisis affects Australian and New Zealand companies, from airlines to banks
Russia pounds Ukraine in massive air attack, killing 1
Philippines warns about serious power cuts due to heat and outages