Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

Miller Boat Contract to Great Lakes Group

October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Logistics News

Argent LNG, Albania to Evaluate Development of Import Terminal

Argent LNG, Albania to Evaluate Development of Import Terminal

WTO: Global Goods Trade Strengthens Despite Uneasy Politics

WTO: Global Goods Trade Strengthens Despite Uneasy Politics

Kuwait Petroleum Offers Oil, Refined Fuel Outside the Strait of Hormuz

Kuwait Petroleum Offers Oil, Refined Fuel Outside the Strait of Hormuz

Wheat Prices Rise After US Diplomatic Attempts Falter

Wheat Prices Rise After US Diplomatic Attempts Falter

Subscribe for Maritime Logistics Professional E‑News

Trump Administration proposes to waive the grace period for H-1B Holders after Job Loss
Russia attacks petrol station in Kyiv and global agribusiness Dnipro
Ryanair's O'Leary accuses UK Air Traffic Control boss of lying about outage