Indian Port Extends Container Handling Capability

February 24, 2013

A second container terminal at V.O. Chidambaranar Port at Tuticorin, Tamil Nadu, India to be ready by year-end.

The second container terminal will have a handling capacity of six hundred thousand TEUs (20-foot equivalent units) to cater to the needs of export/import traders, reports The Hindu.

The need has arisen as the container handling capacity of the existing terminal has reached a saturation point. The terminal will commence interim operations by deploying gantry cranes within two months and its full-fledged operations will commence from the beginning of 2014. The capacity of the port will increase to one million TEUs.

The new terminal will have a draft of 12.8 m and the estimated project cost is Rs 312.23 crore (a crore is equal to 10-million).

Source: The Hindu

Logistics News

Baltic Index Drops to Four Week Low

Baltic Index Drops to Four Week Low

HD Hyundai to Supply Four Port Cranes to Tacoma

HD Hyundai to Supply Four Port Cranes to Tacoma

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

DP World Completes Dredging Milestone for Senegalese Container Port

DP World Completes Dredging Milestone for Senegalese Container Port

Subscribe for Maritime Logistics Professional E‑News

Russia claims that its overnight attacks on Ukraine have hit three military factories and a ship
London insurers expand high-risk Red Sea zone following Houthi attacks
Air France-KLM exceeds its quarterly profit forecasts but reduces its capacity forecasts