Hammerfest LNG Plant Resumes Production

August 5, 2012

Hammerfest LNG Plant: Photo credit Statoil
Hammerfest LNG Plant: Photo credit Statoil

The Norwegian LNG plant was shut down due to water ingress in natural gas driers, but is now back in production.

Large amounts of natural gas are sent ashore and cooled down at Hammerfest LNG on Melkøya, the world’s most northerly and Europe’s first export facility for LNG from Snøhvit, the first petroleum development in the Barents Sea that has no installations above the sea’s surface.

Statoil’s share of production from Snøhvit comprises roughly 50,000 barrels of oil equivalents per day.

The Melkøya plant is now gradually returning to full production following a 10th July 2012 temporarary shutdown.

 

Logistics News

Singapore Evaluates Ammonia Bunkering Solution

Singapore Evaluates Ammonia Bunkering Solution

Europe’s Ports Call for Swift Adoption of IMO Net-Zero Framework

Europe’s Ports Call for Swift Adoption of IMO Net-Zero Framework

Hardik Gajjar Joins HDR as Maritime Planning Lead

Hardik Gajjar Joins HDR as Maritime Planning Lead

Court Rules on DP World Djibouti Case

Court Rules on DP World Djibouti Case

Subscribe for Maritime Logistics Professional E‑News

President Kenya says Kenya will set up sovereign wealth funds and infrastructure funds
Biya is set to serve his eighth term in Cameroon despite calls for him to step down.
Vilnius Airport suspends all traffic due to possible balloons in the airspace