marine link image

East Coast UK Wind Farm: Final Turbine Installed

April 4, 2013

The 75th and final turbine has been installed at the Lincs Offshore Wind Farm.

The installation marks a major milestone in the development of the 270MW project, which will be capable of producing enough energy to meet the annual power needs of more than 200,000 households – equivalent to two thirds of the homes in Lincolnshire, reports the Lincolnshire Echo.

Construction of the project, located eight kilometres (five miles) off the coast of Skegness, started in 2010 with full commissioning expected later this year.

Lincs is a joint venture between leading UK energy company Centrica Energy, DONG Energy and Siemens Project Ventures. When complete it will be managed from Centrica’s new operations and maintenance base in Grimsby, which was opened last year as a major new hub for the business.

Source" Lincolnshire Echo
 

Logistics News

Kuwaiti Tanker Ablaze in Dubai Port

Kuwaiti Tanker Ablaze in Dubai Port

Titan Clean Fuels and TURN2X Agree e-Methane Supply Deal

Titan Clean Fuels and TURN2X Agree e-Methane Supply Deal

Livestock Still Being Sent to War Zones

Livestock Still Being Sent to War Zones

Ammonia, Fertilizer Trade Threatened by Strait of Hormuz Conflict

Ammonia, Fertilizer Trade Threatened by Strait of Hormuz Conflict

Subscribe for Maritime Logistics Professional E‑News

China Southern will return to profitability in 2025, after five years of losses
TSX gains on mining, energy and energy as Middle East conflict intensifies
After engine failure, a US-bound Delta flight returns from Sao Paulo to the airport