Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

East Coast UK Wind Farm: Final Turbine Installed

April 4, 2013

The 75th and final turbine has been installed at the Lincs Offshore Wind Farm.

The installation marks a major milestone in the development of the 270MW project, which will be capable of producing enough energy to meet the annual power needs of more than 200,000 households – equivalent to two thirds of the homes in Lincolnshire, reports the Lincolnshire Echo.

Construction of the project, located eight kilometres (five miles) off the coast of Skegness, started in 2010 with full commissioning expected later this year.

Lincs is a joint venture between leading UK energy company Centrica Energy, DONG Energy and Siemens Project Ventures. When complete it will be managed from Centrica’s new operations and maintenance base in Grimsby, which was opened last year as a major new hub for the business.

Source" Lincolnshire Echo
 

Logistics News

Argent LNG, Albania to Evaluate Development of Import Terminal

Argent LNG, Albania to Evaluate Development of Import Terminal

WTO: Global Goods Trade Strengthens Despite Uneasy Politics

WTO: Global Goods Trade Strengthens Despite Uneasy Politics

Kuwait Petroleum Offers Oil, Refined Fuel Outside the Strait of Hormuz

Kuwait Petroleum Offers Oil, Refined Fuel Outside the Strait of Hormuz

Wheat Prices Rise After US Diplomatic Attempts Falter

Wheat Prices Rise After US Diplomatic Attempts Falter

Subscribe for Maritime Logistics Professional E‑News

US Court of appeals rejects Trump's bid to implement voting restrictions by mail
Philippine rescuers continue to search for survivors after the fire on a Palawan ferry
AirBaltic has postponed a key bondholders meeting