China Shipyard CMA CGM Modification Contract

April 15, 2013

Zhoushan COSCO Shipyard  contracted for modification and repair of CMA CGM container ships.

Three French CMA CGM 8200TEU-series container ships have been docked at Zhoushan Shipyard for bulb bow modification involving 290 tons of steel-work as well as other routine hull repair work including 11,186 sq. metres of sanding and re-coating.

Engine maintenance is being carried out and auxiliary energy-saving devices are also being installed.

The COSCO shipyard says that last year CGM was pleased with work done on another of its vessels, leading to the 2013 signing of a further cooperation agreement between the two companies for modification and repair work.

Logistics News

Baltic Index Drops to Four Week Low

Baltic Index Drops to Four Week Low

HD Hyundai to Supply Four Port Cranes to Tacoma

HD Hyundai to Supply Four Port Cranes to Tacoma

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

DP World Completes Dredging Milestone for Senegalese Container Port

DP World Completes Dredging Milestone for Senegalese Container Port

Subscribe for Maritime Logistics Professional E‑News

Ukraine grain and oilseeds forecast increased after favorable weather
German Minister urges faster AI self sufficiency after OpenAI breach
Bombardier tops profit estimates, free cash flow turns positive on strong jet demand