NYK Charters 2 LNG Carriers for Freeport LNG Project

September 10, 2015

 

Two joint-venture companies that NYK has established with Chubu Electric Power Co. Inc. each concluded a time-charter contract for a new liquefied natural gas (LNG) carrier with Chubu Electric Power Co. Inc.

In addition, one of the joint-venture companies, Trans Pacific Shipping 6 Limited, concluded a shipbuilding contract with MI LNG Company Limited,* and other joint-venture company, Trans Pacific Shipping 7 Limited, concluded a shipbuilding contract with Kawasaki Heavy Industries Ltd.

These new ships will be managed by NYK after being delivered in 2018 and assigned to transport LNG for a 20-year period from the Freeport LNG Project, in which Chubu Electric Power Co. Inc. has an equity interest.

In accordance with its “More Than Shipping 2018” medium-term management plan, NYK will continue its efforts to be a part of stable and economical LNG transport.

* MI LNG Company Limited 
A joint venture established in April 2013 by Mitsubishi Heavy Industries Ltd. (equity ownership 51%) and Imabari Shipbuilding Co. Ltd. (49%) for designing and marketing new LNG carriers. 

Outline of LNG Carrier for Trans Pacific Shipping 6 Limited 

(1)

Owner

Trans Pacific Shipping 6 Limited 
(Shareholders: Chubu Electric Power Co. Inc. 50%, NYK 50%)

(2)

Flag

Bahamas

(3)

Ship management

NYK

(4)

Shipbuilder

Mitsubishi Heavy Industries Ltd., Nagasaki Shipyard & Machinery Works

(5)

Cargo tank capacity

About 180,000 cubic meters

(6)

Gross tonnage

About 151,500 tons

(7)

Length overall

About 297.5 meters

(8)

Breadth

48.94 meters

(9)

Main engine

STaGE (Steam Turbine and Gas Engines)

(10)

Delivery

2018 (scheduled)



Outline of LNG Carrier for Trans Pacific Shipping 7 Limited 

(1)

Owner

Trans Pacific Shipping 7 Limited 
(Shareholders: Chubu Electric Power Co. Inc. 50%, NYK 50%)

(2)

Flag

Bahamas

(3)

Ship management

NYK

(4)

Shipbuilder

Kawasaki Heavy Industries Ltd., Sakaide Shipyard

(5)

Cargo tank capacity

About 177,000 cubic meters

(6)

Gross tonnage

About 137,000 tons

(7)

Length overall

About 300.0 meters

(8)

Breadth

48.90 meters

(9)

Main engine

DFDE (Dual Fuel Diesel Electric)

(10)

Delivery

2018 (scheduled)



Logistics News

Stolt-Nielsen Limited Executive Management Update

Stolt-Nielsen Limited Executive Management Update

Trump Administration Seeks to Negotiate with China on Shipping

Trump Administration Seeks to Negotiate with China on Shipping

CMA CGM Reverses Mali Suspension

CMA CGM Reverses Mali Suspension

LNG Canada Starts Up Kitimat Train 2

LNG Canada Starts Up Kitimat Train 2

Subscribe for Maritime Logistics Professional E‑News

Exxon to supply 500,000 tonnes of LNG to India's Petronet LNG by 2026
Brazil investigates threats to the power grid of COP30's host city after deadly Rio raid
Enbridge, a Canadian oil pipeline company, plans a second phase for the Mainline expansion.