Edvard Grieg News

 

Edvard Grieg topside complete

Apr 14, 2015

The 22,000-tonne topside for the new offshore platform for the Lundin Norway-operated Edvard Grieg field is ready for delivery, in line with the contract awarded three years ago. Image of the Edvard Grieg project…

Ivar Aasen production drilling starts

Jan 22, 2015

Maersk Drilling's Maersk Interceptor harsh environment jackup drilling rig has started production well drilling on Det norske oljeselskap's Ivar Aasen development in the Norwegian sector of the North Sea. The drilling campaign will last…

Lundin's 2015 budget falls 31%

Jan 07, 2015

Lundin Petroleum has announced a US$1.45 billion 2015 development, appraisal and exploration budget - representing a 31% drop compared to its forecast 2014 spending. Spending on development projects will drop about 30%, to $980 million…

Edvard Grieg moving forward

Oct 21, 2014

Lundin Petroleum shows how the production platform for the Edvard Grieg field has moved from the drawing board to reality, and is now beginning to resemble a real offshore platform. First oil from the field is scheduled during the 4Q 2015…

Lundin assesses Edward Grieg upside

May 12, 2014

Lundin Petroleum (Lundin Petroleum), through its wholly-owned subsidiary Lundin Norway (Lundin Norway), is pleased to announce that the appraisal drilling and testing of the well 16/1-18 on the Edvard Grieg field in the North Sea sector of…

Lundin increases spending

Jan 08, 2014

Lundin Petroleum AB is to increase its spending on new developments by 25%, to US$1.4 billion, in 2014. The majority of the cash (75%) will be spent on ongoing projects offshore Norway, with most of the rest being spent on the Bertram development in Malaysia…

Contract Briefs: December 2013

Dec 02, 2013

Statoil, Technip sign framework contract Statoil has made a call-off for the framework contract Technip has with Statoil for diving services. The work will be performed in connection with the future Edvard Grieg oil pipeline as well as Utsira high gas pipeline…

Statoil picks Technip for Edvard Grieg pipeline work

Nov 15, 2013

Technip was awarded contract work from Statoil for a subsea project related to the Edvard Grieg field, in PL338, Block 16/1 in the North Sea, about 180 km west of Stavanger, Norway. Statoil has made a call-off for the framework contract Technip has with Statoil for diving services…

Lundin spuds Luno II South

Nov 11, 2013

Lundin Norway AS (Lundin Norway) has started drilling appraisal well 16/5-5 in production license 410. The well will target the Luno II South structure, 9km southeast of the Luno II discovery well 16/4-6S in PL359, in the Norwegian sector of the North Sea…

Kvaerner in Moscow move

Oct 30, 2013

Norwegian engineering and construction firm Kvaerner has opened an office in Moscow to position itself for future arctic construction projects. Kvaerner's office in Moscow is being led by Andrey Plotnikov, with a staff of 10 people currently focusing on business development activities…

OMV strikes US$2.65bn deal

Aug 20, 2013

Austrian energy group OMV is to buy Norwegian and UK North Sea assets from Norway’s Statoil in a US$2.65billion deal. The deal will see OMV acquire 19% interest in the producing Gullfaks field and 24% in the Gudrun field, both oil and gas fields offshore the Norwegian Continental Shelf…

Lundin spuds well on Biotitt prospect

Jul 23, 2013

Lundin Petroleum AB (Lundin Petroleum) began drilling of exploration well 16/4-7 in PL544. The well will target the Biotitt prospect, which is located some 35 km south of the Edvard Grieg Field and 46 km southwest of the Johan Sverdrup Field…

Luno II discovery for Lundin

Apr 08, 2013

Lundin Petroleum AB (Lundin Petroleum) through its wholly owned subsidiary Lundin Norway AS (Lundin Norway) is pleased to announce that the drilling of exploration well 16/4-6S on the Luno II prospect has resulted in a potentially significant oil discovery…

Revitalising the Norwegian shelf

Oct 01, 2012

A number of operators on the Norwegian shelf revealed updates of their field development plans at the recent Offshore Northern Seas conference in Stavanger, with a substantial list of projects and refurbishments going forward as part of the revitalisation of the Norwegian shelf…

Kvaerner

Jun 26, 2012

A new Goliath gantry crane that will increase yard lifting capacity from 350t to 800t and enable two topside projects to be worked on in parallel is among the big-ticket items in Kvaerner’s planned NKr250 million upgrade of its Stord facilities in Norway…

Logistics News

Montrose Becomes First Port in Scotland to Provide Shore Power for Vessels

Montrose Becomes First Port in Scotland to Provide Shore Power for Vessels

Port Operator JSW Infrastructure Q4 Profit Rises 10%

Port Operator JSW Infrastructure Q4 Profit Rises 10%

The Nordic Maritime Forum 2024 will happen in Oslo

The Nordic Maritime Forum 2024 will happen in Oslo

Renewable Energy System Dedicated at Port of Long Beach

Renewable Energy System Dedicated at Port of Long Beach

Subscribe for Maritime Logistics Professional E‑News