marine link image
Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

USN Successfully Tests Electromagnetic Catapult on CVN 78

May 17, 2015

 

The Navy conducted the first-ever, shipboard, full-speed catapult shots using the Electromagnetic Aircraft Launch System (EMALS) aboard the aircraft carrier Pre-Commissioning Unit (PCU) Gerald R. Ford (CVN 78), Naval Sea Systems Command announced May 15.

EMALS is a carrier-based launch system designed to expand the operational capability of the Navy's future carriers to include all current and future planned carrier aircraft. The recent test shots, known as "no-loads" because no aircraft or other loads were attached to the launching shuttle, successfully demonstrated the integrated catapult system. Using electromagnetic technology, the system delivers substantial improvements in system maintenance, increased reliability and efficiency, higher-launch energy capacity, and more accurate end-speed control, with a smooth acceleration at both high and low speeds. By allowing linear acceleration over time, electromagnetic catapults also place less stress on the aircraft.

"This is a very exciting time for the Navy," said Program Executive Officer for Aircraft Carriers Rear Adm. Tom Moore. "For the first time in over 60 years, we've just conducted 22 no load test shots using electricity instead of steam technology."

During the tests, generators within the ship produced an electric pulse, which was passed through power conditioning electronics to linear motors just below the flight deck surface. This energy allowed for the linear motors to propel the launching shuttle down the catapult track in excess of 180 knots before bringing the shuttle to a stop at the end of the track.

The next phase of EMALS testing, scheduled for this summer, will involve launching "dead-loads" off of the bow of CVN 78 into the James River. "Dead-loads" are large, wheeled, steel vessels weighing up to 80,000 pounds to simulate the weight of actual aircraft. The dead-loads will be launched from each catapult using a specific test sequence to verify that the catapult and its components are operating satisfactorily.

To date PCU Gerald R. Ford is 90 percent complete and 1550 Sailors have reported for introduction and training. CVN 78 will be commissioned in March 2016.
 

Logistics News

Saudi Forces Strike Hodeidah Port as Houthis Warn Airlines Away From Airspace

Saudi Forces Strike Hodeidah Port as Houthis Warn Airlines Away From Airspace

Houthis Warn of Attacks on Saudi Red Sea Ports

Houthis Warn of Attacks on Saudi Red Sea Ports

ARC United Large Car, Truck Carrier Joins US Fleet for Military Support

ARC United Large Car, Truck Carrier Joins US Fleet for Military Support

Port of Los Angeles Releases Environmental Impact Draft for Proposed Terminal Improvements

Port of Los Angeles Releases Environmental Impact Draft for Proposed Terminal Improvements

Subscribe for Maritime Logistics Professional E‑News

LPG tanker sends distress signal off Bulgaria's Black Sea coast, maritime security sources say
US presses UN agency over Taiwan flight restrictions, China hits back
Midterm Meltdown - How US elections sparked a rethink on energy risks: Maguire