marine link image
Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

USN Successfully Tests Electromagnetic Catapult on CVN 78

May 17, 2015

 

The Navy conducted the first-ever, shipboard, full-speed catapult shots using the Electromagnetic Aircraft Launch System (EMALS) aboard the aircraft carrier Pre-Commissioning Unit (PCU) Gerald R. Ford (CVN 78), Naval Sea Systems Command announced May 15.

EMALS is a carrier-based launch system designed to expand the operational capability of the Navy's future carriers to include all current and future planned carrier aircraft. The recent test shots, known as "no-loads" because no aircraft or other loads were attached to the launching shuttle, successfully demonstrated the integrated catapult system. Using electromagnetic technology, the system delivers substantial improvements in system maintenance, increased reliability and efficiency, higher-launch energy capacity, and more accurate end-speed control, with a smooth acceleration at both high and low speeds. By allowing linear acceleration over time, electromagnetic catapults also place less stress on the aircraft.

"This is a very exciting time for the Navy," said Program Executive Officer for Aircraft Carriers Rear Adm. Tom Moore. "For the first time in over 60 years, we've just conducted 22 no load test shots using electricity instead of steam technology."

During the tests, generators within the ship produced an electric pulse, which was passed through power conditioning electronics to linear motors just below the flight deck surface. This energy allowed for the linear motors to propel the launching shuttle down the catapult track in excess of 180 knots before bringing the shuttle to a stop at the end of the track.

The next phase of EMALS testing, scheduled for this summer, will involve launching "dead-loads" off of the bow of CVN 78 into the James River. "Dead-loads" are large, wheeled, steel vessels weighing up to 80,000 pounds to simulate the weight of actual aircraft. The dead-loads will be launched from each catapult using a specific test sequence to verify that the catapult and its components are operating satisfactorily.

To date PCU Gerald R. Ford is 90 percent complete and 1550 Sailors have reported for introduction and training. CVN 78 will be commissioned in March 2016.
 

Logistics News

European Wheat Prices Rise to One-Week High

European Wheat Prices Rise to One-Week High

US LNG Exports Increase in September, Europe Outbids Asia for Cargoes

US LNG Exports Increase in September, Europe Outbids Asia for Cargoes

FPT, ZEBOX to Advance AI Solutions in Transportation, Logistics

FPT, ZEBOX to Advance AI Solutions in Transportation, Logistics

Valenciaport Sandbox Conducts Successful Port Logistics Solution Pilot

Valenciaport Sandbox Conducts Successful Port Logistics Solution Pilot

Subscribe for Maritime Logistics Professional E‑News

US FAA: Error messages in the telecommunications system prompted Sunday's shift to backup
Ukraine exports to Baltic ports, just like Russia
Volkswagen recalls 4 million cars, Handelsblatt reports