Subsea 7 Bags Contracts Offshore Norway

January 24, 2018

Subsea 7 S.A. said it was awarded a contract from Statoil for the Johan Castberg field development, located 240 km from Hammerfest in Norway.

The contract comprises the design, coating, fabrication and installation of a 53 km rigid flowline including 34 km of pipe-in-pipe flowline.  

Project Management and engineering will commence immediately at Subsea 7’s offices in Stavanger, Norway. Fabrication will take place at Subsea 7’s spoolbase at Vigra, Norway and offshore operations will be carried out in 2020. 

Subsea 7 did not specify the value of the contract, but said it is between $50 million and $150 million.

Logistics News

Ship Design, Maritime Accidents and There’s a Master on the Run

Ship Design, Maritime Accidents and There’s a Master on the Run

Maersk: Effective US Tariffs Average Around 21% Currently

Maersk: Effective US Tariffs Average Around 21% Currently

US Grain Shipments Surge 9% in face of Chinese Tariffs

US Grain Shipments Surge 9% in face of Chinese Tariffs

Great Lakes Limestone Trade Up in June

Great Lakes Limestone Trade Up in June

Subscribe for Maritime Logistics Professional E‑News

UK maritime agency reports that a ship was attacked in the Red Sea near Yemen.
Homeland Security reports eight migrants were deported to South Sudan from Djibouti.
Mayor of Moscow: Russian air defences shot down four drones heading for Moscow