marine link image
Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

Submarine 'Minnesota' Completes First Round of Sea Trials

May 7, 2013

Sea Trial SSN 783: Photo credit HII
Sea Trial SSN 783: Photo credit HII

'Minnesota' (SSN 783) being built at HII's Newport News Shipbuilding (NNS) division, successfully completes 'Alpha' sea trials.

All systems, components and compartments were tested during the trials. The submarine submerged for the first time and operated at high speeds on the surface and under water. Minnesota will undergo two more rounds of sea trials, including one with the Navy's Board of Inspection and Survey, before delivery later this month. Minnesota is anticipated to deliver approximately 11 months ahead of its contracted delivery date.

"This submarine is the result of a lot of hard work by the shipbuilders here at Newport News, our teammates at Electric Boat, and the overall Navy organizational structure, including NAVSEA, SUPSHIP and ship's force personnel," said Jim Hughes, NNS' vice president of submarines and fleet support. "It is incredibly gratifying for all of us to see this magnificent vessel operate so well during her first at-sea period. Minnesota clearly carries on the Virginia-class tradition of continuous cost and schedule improvement while also raising the bar on operational readiness and capability."

Minnesota, named to honor the state's residents and their continued support of the U.S. military, is the last of the block II Virginia-class submarines and is in the final stages of construction and testing at NNS. Construction began in February 2008, and the keel was authenticated in May 2011. The boat was christened Oct. 27, 2012.
 

Logistics News

Baltic Index Hits Third Weekly Loss As Capesize Rates Remain Weak

Baltic Index Hits Third Weekly Loss As Capesize Rates Remain Weak

European Wheat Falls Alongside Shifts in the Euro, Russian Exports

European Wheat Falls Alongside Shifts in the Euro, Russian Exports

Oil Supertanker Rates Drop After Record Highs

Oil Supertanker Rates Drop After Record Highs

DP World Busan Deploys Electric Yard Tractors

DP World Busan Deploys Electric Yard Tractors

Subscribe for Maritime Logistics Professional E‑News

Alaska Air expects certification of the Boeing 737 MAX 10 by end-September
Boeing flags 737 MAX Software Bug Affecting Landing Navigation Feature, WSJ Reports
Smoke in the cabin causes emergency landing of a Boston bound Delta flight in Portugal