Strong Winds Hit Haiyangshiyou 113

November 12, 2009

CNOOC Limited announced that the Floating, Production, Storage and Offloading (FPSO) vessel Haiyangshiyou 113 shifted from its moorings by strong winds in the Bohai Bay area, has been safely secured. There were no injuries or oil spills.

Operations at the BZ25-1/BZ25-1South oilfields were shut-in on November 10 as a safety precaution during the strong winds, and recovery activities are now being remobilized

BZ25-1/BZ25-1South oilfield is a joint project developed with Chevron. CNOOC Ltd. holds 83.8% of interest and acts as the Operator. Before this incident, the production capacity of BZ25-1/BZ25-1South oilfield was approximately 27,000 barrels per day.

The company maintains appropriate insurance coverage of the operations related to the oilfield.

(www.cnoocltd.com)

Logistics News

Greensea IQ Launches Autonomous Hull and Infrastructure Inspection Robot

Greensea IQ Launches Autonomous Hull and Infrastructure Inspection Robot

Cruise Ship First to Bunker LNG at Civitavecchia

Cruise Ship First to Bunker LNG at Civitavecchia

Bryan Jones Named HDR Marine Terminals Leader

Bryan Jones Named HDR Marine Terminals Leader

Ukraine Attacks Naval Base, Grain Terminals at Novorossiysk

Ukraine Attacks Naval Base, Grain Terminals at Novorossiysk

Subscribe for Maritime Logistics Professional E‑News

E.ON CEO: Full grid protection against drones is 'illusory.'
Ship recycling company GMS purchases two tankers that are subject to US sanctions
Etna ash causes Catania airport to be closed for longer, disrupting travel during peak season