Petrobras Charter FPSO for Offshore Brazil Project

November 13, 2012

An FPSO Vessel: Photo credit CCL Marcus Wong
An FPSO Vessel: Photo credit CCL Marcus Wong

Petrobras with partners BG Group and Petrogal Brasi inks charter of the FPSO from Schahin Petróleo e Gás S.A. and Modec Inc.

The Floating Production Storage & Offloading vessel (FPSO)  will be used in the production development project of the area known as Iracema Norte, in block BM-S-11, in the pre-salt of Santos Basin. The project includes the interconnection of 16 wells to the FPSO - 8 production and 8 injection wells - and production is expected to start in December 2015.

The FPSO will be deployed 300 Km off Brazil's coast, at a water depth of 2,234 meters. The platform will have a processing capacity of 150,000 bpd of oil and 8 million m3/day of natural gas. It will be operated by the companies responsible for the construction and chartered to the Consortium for a 20-year period. The schedule of the project determines the delivery of the FPSO 35 months following the signature of the Letter of Intent.

The BM-S-11 Consortium is operated by Petrobras (65%), in partnership with BG E&P do Brasil Ltda. (25%) and Petrogal Brasil S.A (10%).



 

Logistics News

Port of Oakland Moves 174,239 TEUs in November as Exports Increase

Port of Oakland Moves 174,239 TEUs in November as Exports Increase

CMA CGM Vessels Navigate the Suez Canal, Hinting at Easing Tensions

CMA CGM Vessels Navigate the Suez Canal, Hinting at Easing Tensions

Oil Loading in Venezuela Crawls After New US Interceptions

Oil Loading in Venezuela Crawls After New US Interceptions

FMC Investigates Spain’s Restrictive Port Practices

FMC Investigates Spain’s Restrictive Port Practices

Subscribe for Maritime Logistics Professional E‑News

Onley, a Scottish cyclist, signs with INEOS Grenadiers
France condemns the US visa ban on Breton, former EU commissioner
Malaysia's Petronas signs a LNG supply agreement with China's CNOOC