Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

Jumbo Set to Offload Heavy-lift Tunnel-boring Machine

April 4, 2013

Loading Bertha in Japan: Photo credit Jumbo
Loading Bertha in Japan: Photo credit Jumbo

'M/V Fairpartner' is due to discharge the largest tunnel boring machine (TBM) ever made at the port of Seattle, Friday, 5, April 2013.

The tunnel boring machine was built by Hitachi Zosen Corporation and loaded at Osaka, Japan. It consists of total 48 pieces weighing 7,777 metric tons and measuring 31.606 cubic meters; the heaviest item is close to 900 metric tons.

The tunnel boring machine was named ‘Bertha’ after Bertha Knight Landes, Seattle’s first female mayor.

With her 17 meters diameter and length of close to a 100 meters, the machine will dig the 2.8 km long SR99 tunnel beneath downtown Seattle and it should be operational in 2015.
 

Logistics News

SSA Marine México Guaymas Terminal Received STS, ERTG Cranes

SSA Marine México Guaymas Terminal Received STS, ERTG Cranes

Xeneta Shares Weekly Ocean Container Shipping Market Update

Xeneta Shares Weekly Ocean Container Shipping Market Update

Cocoa Futures Drop While Sugar, Coffee Steady

Cocoa Futures Drop While Sugar, Coffee Steady

Maersk Orders 26 Large Containerships in Fleet Renewal

Maersk Orders 26 Large Containerships in Fleet Renewal

Subscribe for Maritime Logistics Professional E‑News

Brazil Police seize devices from former iFood Employee in Trade Secrets Probe
Denmark accelerates Ukraine aid package following Russian warship firing flares at helicopter
Minister: Ukraine will prioritize exports of higher-value agricultural products.