Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

VT Halter, Q-LNG Name First LNG ATB

October 1, 2019

Members of the U.S. Navy Seabees Color Guard present colors at the Q-LNG 4000 naming ceremony at VT Halter Marine (Photo: VT Halter Marine)
Members of the U.S. Navy Seabees Color Guard present colors at the Q-LNG 4000 naming ceremony at VT Halter Marine (Photo: VT Halter Marine)

VT Halter Marine, Inc., a ST Engineering North America company, held a vessel naming ceremony for America’s first offshore Liquefied Natural Gas Articulated Tug and Barge (LNG ATB) unit.

The Q-LNG 4000 (barge) and the Q-Ocean Services (tug) were officially named in a ceremony that included U.S. Senator Roger Wicker, U.S. Senator Cindy Hyde-Smith and U.S. Rep. Steven Palazzo, along with Shane Guidry, CEO of Q-LNG, and Tom Vecchiolla, President and CEO of ST Engineering North America.

Over the last four years, Jones Act ship operators have taken steps to transition their fleets to use cleaner burning fuels, including LNG. Designed and built by VT Halter, the barge is designed to provide ship-to-ship transfers of LNG to vessels that use LNG as a fuel source and also ship-to-shore transfers to small scale marine distribution infrastructure in the U.S. Gulf of Mexico and abroad.

“When I am in DC, I always say, ‘Let me tell you about the fabulous shipbuilders on the Mississippi Gulf.’ You are a key part of our national defense,” Hyde-Smith said. “I am confident of the quality of work that comes out of VT Halter Marine, such as this Q-LNG barge and the Polar Security Cutter that you are working on now. You give us plenty to brag about in Washington D.C.”

The ATB tug will have 5,100 horsepower, GE 6L250 MDC EPA Tier 4 main engines, with Wartsila Z-drives, and dimensions of 128’ x 42’ x 21’. The barge is designed to carry 4,000 cubic meters of LNG, and will have dimensions of 324’ x 64’ x 32’.6”.

The LNG ATB Unit is designed to meet the requirements of American Bureau of Shipbuilding and the International Gas Carrier code as an LNG bunkering barge.

Anticipated delivery of the first unit is in the first quarter of 2020. 

Maritime Reporter & Engineering News interviewed Ron Baczkowski, President and CEO, VT Halter Marine, in the August 2019 edition.
https://www.marinelink.com/news/shipbuilding-interview-ron-baczkowski-vt-469561

Logistics News

Russia Strikes Five Vessels in Ports Along Ukrainian Black Sea

Russia Strikes Five Vessels in Ports Along Ukrainian Black Sea

Russian Oil Freight Rates Spike On Security Risks, Vessel Availability

Russian Oil Freight Rates Spike On Security Risks, Vessel Availability

Rigid Wingsail Retrofit Successfully Completed Aboard Bulk Carrier

Rigid Wingsail Retrofit Successfully Completed Aboard Bulk Carrier

RSGT, CMA CGM Announce $434m to Develop New Container Terminal at Jeddah Islamic Port

RSGT, CMA CGM Announce $434m to Develop New Container Terminal at Jeddah Islamic Port

Subscribe for Maritime Logistics Professional E‑News

United CEO anticipates gradual fare increases by 2027, as demand remains strong
US Supreme Court gives Trump a victory over restrictions on mail-in voting
SpaceX will build Starship rocket facility in Louisiana