Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

VT Halter, Q-LNG Name First LNG ATB

October 1, 2019

Members of the U.S. Navy Seabees Color Guard present colors at the Q-LNG 4000 naming ceremony at VT Halter Marine (Photo: VT Halter Marine)
Members of the U.S. Navy Seabees Color Guard present colors at the Q-LNG 4000 naming ceremony at VT Halter Marine (Photo: VT Halter Marine)

VT Halter Marine, Inc., a ST Engineering North America company, held a vessel naming ceremony for America’s first offshore Liquefied Natural Gas Articulated Tug and Barge (LNG ATB) unit.

The Q-LNG 4000 (barge) and the Q-Ocean Services (tug) were officially named in a ceremony that included U.S. Senator Roger Wicker, U.S. Senator Cindy Hyde-Smith and U.S. Rep. Steven Palazzo, along with Shane Guidry, CEO of Q-LNG, and Tom Vecchiolla, President and CEO of ST Engineering North America.

Over the last four years, Jones Act ship operators have taken steps to transition their fleets to use cleaner burning fuels, including LNG. Designed and built by VT Halter, the barge is designed to provide ship-to-ship transfers of LNG to vessels that use LNG as a fuel source and also ship-to-shore transfers to small scale marine distribution infrastructure in the U.S. Gulf of Mexico and abroad.

“When I am in DC, I always say, ‘Let me tell you about the fabulous shipbuilders on the Mississippi Gulf.’ You are a key part of our national defense,” Hyde-Smith said. “I am confident of the quality of work that comes out of VT Halter Marine, such as this Q-LNG barge and the Polar Security Cutter that you are working on now. You give us plenty to brag about in Washington D.C.”

The ATB tug will have 5,100 horsepower, GE 6L250 MDC EPA Tier 4 main engines, with Wartsila Z-drives, and dimensions of 128’ x 42’ x 21’. The barge is designed to carry 4,000 cubic meters of LNG, and will have dimensions of 324’ x 64’ x 32’.6”.

The LNG ATB Unit is designed to meet the requirements of American Bureau of Shipbuilding and the International Gas Carrier code as an LNG bunkering barge.

Anticipated delivery of the first unit is in the first quarter of 2020. 

Maritime Reporter & Engineering News interviewed Ron Baczkowski, President and CEO, VT Halter Marine, in the August 2019 edition.
https://www.marinelink.com/news/shipbuilding-interview-ron-baczkowski-vt-469561

Logistics News

Ships Trickle Through Strait of Hormuz

Ships Trickle Through Strait of Hormuz

Houston Ship Channel Trade Tonnage Climbs 16%

Houston Ship Channel Trade Tonnage Climbs 16%

China Ships First Large Cargo of Brazilian Sorghum

China Ships First Large Cargo of Brazilian Sorghum

Conoship Adds 40-MWh Battery-Electric Option to CIP3800 Coaster

Conoship Adds 40-MWh Battery-Electric Option to CIP3800 Coaster

Subscribe for Maritime Logistics Professional E‑News

Bundesbank: German economy is hampered due to depleted rivers
US FTC is considering requiring disclosure of customized pricing
At least 40 bodies found after a boat overloaded with passengers capsizes in Nigeria