Grandweld to Build Third Crewboat for Khalid Faraj

October 3, 2013

Grandweld Shipyards secured a repeat order worth $5 million (USD) to build a 42-meter aluminum crewboat for Khalid Faraj Shipping. This is the third order received by Grandweld from Khalid Faraj over the last five months. The contract signing took place at Middle East Workboats Conference and Exhibition held in Abu Dhabi on October 1, 2013.

Jamal Abki, general manager if Grandweld Shipyards, explained, the 42-meter fast aluminum boat is based on Grandweld’s existing design. The vessel is capable of reaching speeds upwards of 26 knots. Abki added that the crewboat will feature luxury seating, VIP accomodation, larger deck space and enhanced crew comfort. With seating for 83 passengers, the vessel has a 110 square meter loading area for more than 90 tons of deck cargo. The vessel can also carry a large amount of fuel and fresh water.

grandweld.com

Logistics News

ABS Fortifies Digital, Remote Support for Offshore Energy

ABS Fortifies Digital, Remote Support for Offshore Energy

How JobMarineMan Is Building a Direct Crew Recruitment Ecosystem

How JobMarineMan Is Building a Direct Crew Recruitment Ecosystem

Baltic Index Reaches One-Week High on Higher Capesize Rates

Baltic Index Reaches One-Week High on Higher Capesize Rates

NYK Group’s ICO Launches Belgium’s First Shore Power Facility for RoRo Ships

NYK Group’s ICO Launches Belgium’s First Shore Power Facility for RoRo Ships

Subscribe for Maritime Logistics Professional E‑News

Trump unveils Qatari Boeing 747 before joining Air Force One
Although there are questions about Iran's transit conditions, oil shipments to Hormuz have increased.
Nine people are still in critical condition following fatal UK train accident