First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Turkey Tenders to Import 255,000 Metric Tons of Feed Barley

Turkey Tenders to Import 255,000 Metric Tons of Feed Barley

CK Hutchison Launches Arbitration over Panama Canal Ports Contract Ruling

CK Hutchison Launches Arbitration over Panama Canal Ports Contract Ruling

U.S.-Flag Shipping on the Great Lakes Down in 2025

U.S.-Flag Shipping on the Great Lakes Down in 2025

Port of Virginia Advances Capacity with Addition of ULCV Berth

Port of Virginia Advances Capacity with Addition of ULCV Berth

Subscribe for Maritime Logistics Professional E‑News

ZTO Express to issue convertible bonds worth $1.5 billion, according to a term sheet
Union Pacific, Wabtec sign $1.2 bln locomotive modernization deal
Lufthansa, Germany's national airline, celebrates its 100th anniversary by examining Nazi past