First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Samskip to Sell UK and Ireland Freight Business

Samskip to Sell UK and Ireland Freight Business

NOAA Installs Navigation System in Boston Harbor

NOAA Installs Navigation System in Boston Harbor

Exports to China Fall to Lowest Output in Three Years

Exports to China Fall to Lowest Output in Three Years

ZIM Workers Strike Over Hapag-Lloyd Takeover

ZIM Workers Strike Over Hapag-Lloyd Takeover

Subscribe for Maritime Logistics Professional E‑News

After Russian oil flow via Ukraine was halted, Hungary asked Croatia for assistance
Vitol supports proposed $3 billion LNG power station for South Africa's Durban Port
Storm in New Zealand disrupts travel and leaves thousands without electricity