First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

JS Alliance Successfully Completes Indian Liquid Cargo Berth

JS Alliance Successfully Completes Indian Liquid Cargo Berth

Heritage Capital Group Appoints Jamie McCurry as Industry Specialist

Heritage Capital Group Appoints Jamie McCurry as Industry Specialist

CMA CGM, Asyad Plan $400m Terminal at Sohar Port

CMA CGM, Asyad Plan $400m Terminal at Sohar Port

AD Ports Group, Emirates Global Aluminium Invest $22m in Khalifa Port Infrastructure Development

AD Ports Group, Emirates Global Aluminium Invest $22m in Khalifa Port Infrastructure Development

Subscribe for Maritime Logistics Professional E‑News

Two suspects are arrested after five people were shot dead in northern Germany
There are some flights to the Middle East that have resumed but there is still disruption.
Honeywell Aerospace debuts on Nasdaq