First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

First Ethanol Bunkering in Rotterdam Port

First Ethanol Bunkering in Rotterdam Port

Maersk Launches Service to Strengthen India-China Connectivity

Maersk Launches Service to Strengthen India-China Connectivity

Kai Schulte-Schrepping Appointed as Head of Liability Global Risk at HDI Global

Kai Schulte-Schrepping Appointed as Head of Liability Global Risk at HDI Global

Marcura Launches Husbandry Solution to Target Vessel OPEX Gap

Marcura Launches Husbandry Solution to Target Vessel OPEX Gap

Subscribe for Maritime Logistics Professional E‑News

COSCO products tanker leaves Strait of Hormuz; oil traffic still restricted
Source: Apex Service Partners is close to selling minority stakes at $10 billion valuation
China reports that Xinhua says it is not acceptable for third parties to interfere with Panama ties.