First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Stolt-Nielsen Limited Shares Q2, H1 2026 Results

Stolt-Nielsen Limited Shares Q2, H1 2026 Results

Tanker Vessel Contracting Hits Record High

Tanker Vessel Contracting Hits Record High

Concordia Damen to Build Two River Cruise Vessels for TUI River Cruise

Concordia Damen to Build Two River Cruise Vessels for TUI River Cruise

HDI Global US Restructures Underwriting Leadership

HDI Global US Restructures Underwriting Leadership

Subscribe for Maritime Logistics Professional E‑News

BETA is the flight control system of choice for Horizon Aircraft in Canada
Maersk resumes Middle East-US East Coast Shipping through Suez Canal
Russia uses small drones to evade Ukraine's electrical substation defenses