First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Maersk Chooses Charlotte for its North American Headquarters

Maersk Chooses Charlotte for its North American Headquarters

Ruling Allows South African Welfare Group to Inspect Vessels

Ruling Allows South African Welfare Group to Inspect Vessels

APM Terminals Invests $550m in Callao Port

APM Terminals Invests $550m in Callao Port

Liebherr BOS Cranes Celebrates 50 Years

Liebherr BOS Cranes Celebrates 50 Years

Subscribe for Maritime Logistics Professional E‑News

Rescue operation underway for stranded South Korean ferry carrying 267 passengers
How the EU intends to crackdown on low-value ecommerce goods from China
The top Italian court has approved the transfer of a suspect in Nord Stream to Germany