First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Panama President: Future Port Contracts Will Not Be Issued to a Single Operator

Panama President: Future Port Contracts Will Not Be Issued to a Single Operator

Cuba-Related Tanker Loads Gas Cargo in Venezuela

Cuba-Related Tanker Loads Gas Cargo in Venezuela

2027 Set as Operational Start of Petronor E-Fuels Plant at Port of Bilbao

2027 Set as Operational Start of Petronor E-Fuels Plant at Port of Bilbao

AD Ports Group to Manage and Operate Aqaba Multipurpose Port in Jordan

AD Ports Group to Manage and Operate Aqaba Multipurpose Port in Jordan

Subscribe for Maritime Logistics Professional E‑News

ZTO Express to issue convertible bonds worth $1.5 billion, according to a term sheet
Sources say that Airbus' production goal is affected by Pratt engine concerns
IndiGo is under investigation by India's Competition regulator after a mass cancellation of flights