Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

By the Numbers: Container Fleet Capacity to Top 34 Million TEU

By the Numbers: Container Fleet Capacity to Top 34 Million TEU

Floating Titanium Lattice Could Out-Perform Steel and Plastic

Floating Titanium Lattice Could Out-Perform Steel and Plastic

Nuclear Power Considered for Transatlantic Container Route

Nuclear Power Considered for Transatlantic Container Route

Oceanbird to Install Wing Sails on M/V Way Forward

Oceanbird to Install Wing Sails on M/V Way Forward

Subscribe for Maritime Logistics Professional E‑News

Two injured after blast at southern German train station
Uber leaves Nigeria after 12 years in operation
Minister Zelenskiy says that despite Zelenskiy’s threats, Russia will not allow Ukraine seriously to disrupt civil aviation