First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Great Lakes Dredge & Dock Takes Delivery of Hopper Dredge

Great Lakes Dredge & Dock Takes Delivery of Hopper Dredge

Kabal Wins Contract with Phu Quoc Petroleum Operating Company to Optimize Offshore Logistics in Vietnam

Kabal Wins Contract with Phu Quoc Petroleum Operating Company to Optimize Offshore Logistics in Vietnam

U.S. Representative Lisa McClain Recognized as a Great Lakes Champion

U.S. Representative Lisa McClain Recognized as a Great Lakes Champion

Latin American Trade Growth Drives Increase in Port of New Orleans Cargo Volume

Latin American Trade Growth Drives Increase in Port of New Orleans Cargo Volume

Subscribe for Maritime Logistics Professional E‑News

Air Canada's labor agreement could reshape the pay of North American airline crews
China and Afghanistan hold discussions on belt and Road participation, mining
Israel orders Boeing aerial refuelling tanks worth $500 million from the US