First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Rio Brasil Terminal Receives Two New Quay Cranes

Rio Brasil Terminal Receives Two New Quay Cranes

By the Numbers: Maritime Safety in 2026 — Fewer Losses, Bigger Risks

By the Numbers: Maritime Safety in 2026 — Fewer Losses, Bigger Risks

Markets: When Will Container Shipping Return to "Normal"

Markets: When Will Container Shipping Return to "Normal"

HDI Global Reorganizes US Operations, Welcomes New CEO

HDI Global Reorganizes US Operations, Welcomes New CEO

Subscribe for Maritime Logistics Professional E‑News

German expert panel recommends social media ban for children under 13
Binance vows that it will remain in Europe despite a license setback
US airline stocks increase as oil prices fall to pre-Iran War levels