First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

MISC Reports First Quarter Increase in Revenue

MISC Reports First Quarter Increase in Revenue

MacGregor Sees Strong Year Despite Order Dip in First Quarter

MacGregor Sees Strong Year Despite Order Dip in First Quarter

Jumbo Orders Two New Heavy Lift Vessels

Jumbo Orders Two New Heavy Lift Vessels

CMA CGM NOTRE DAME, World’s Largest LNG-Powered Containership, Begins Maiden Voyage

CMA CGM NOTRE DAME, World’s Largest LNG-Powered Containership, Begins Maiden Voyage

Subscribe for Maritime Logistics Professional E‑News

US Space Force awards SpaceX $2.29 Billion contract for military satellite data network
UKMTO: Crew safe after tanker reports external explosion near Oman coast
Uber and Lyft drivers from Massachusetts form the first US ride-sharing union