First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Furetank VINGA Series Tanker to be Named

Furetank VINGA Series Tanker to be Named

Northern Grain Belt Ports Initiative Established

Northern Grain Belt Ports Initiative Established

Container Imports Soar at Port of Los Angeles

Container Imports Soar at Port of Los Angeles

Compas Cartagena Terminal Employs LHM 600 Crane

Compas Cartagena Terminal Employs LHM 600 Crane

Subscribe for Maritime Logistics Professional E‑News

Tropical Cyclone One could form off the Texas coast and cause dangerous flash floods
There are some flights to the Middle East that have resumed but there is still disruption.
US natgas at Waha turns positive for the first time since February, as pipeline constraints ease