First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

DP World to Build Two Container Terminals On UAE's East Coast

DP World to Build Two Container Terminals On UAE's East Coast

Maersk Pauses Service via Chornomorsk Amidst Intensified Russian Attacks

Maersk Pauses Service via Chornomorsk Amidst Intensified Russian Attacks

Inland Tank-Barge Safety Guide Updated

Inland Tank-Barge Safety Guide Updated

BY THE NUMBERS: Copper is Cargo Theft King

BY THE NUMBERS: Copper is Cargo Theft King

Subscribe for Maritime Logistics Professional E‑News

EasyJet's bids are threatened by EU review of airline ownership rules
Saudi Flynas orders 25 more Airbus jets
As fighting continues, the EU Aviation Agency adds Jordan to its no-fly list