First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Port Innovation Congress Draws Record Attendees to Valencia

Port Innovation Congress Draws Record Attendees to Valencia

HD Hyundai, Kiewit Team Up to Build New US Shipyard

HD Hyundai, Kiewit Team Up to Build New US Shipyard

Port of Los Angeles Reports Record Low Emissions

Port of Los Angeles Reports Record Low Emissions

Import Window for Brazil Ethanol to Reopen in January

Import Window for Brazil Ethanol to Reopen in January

Subscribe for Maritime Logistics Professional E‑News

Israel's Netanyahu: Flydubai co-pilot underwent radical Islamist endoctrination
Maricarmen Abascal has died. She was the evicted Spanish 80-year-old who was at the heart of Spain’s housing protests.
TSA officers are not allowed to sit down during ID checks in US airports