First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

Port of Brownsville Welcomes Local, Industry Leaders at State Address

Port of Brownsville Welcomes Local, Industry Leaders at State Address

US Sanctions Cuban State Oil Company

US Sanctions Cuban State Oil Company

Los Angeles Adopts $3.4 Billion Port Budget

Los Angeles Adopts $3.4 Billion Port Budget

Spiridon II Livestock Transport Organizer Due in Court

Spiridon II Livestock Transport Organizer Due in Court

Subscribe for Maritime Logistics Professional E‑News

Brazil launches a subsidised motorcycle credit program for delivery drivers using apps
Source: India summons top US diplomat a second time in protest of strikes on ships near Oman
Spain launches new investigation into former PM Zapatero after finding jewellery in his office