First Ever Dual Drydocking of Aegis Destroyers

February 6, 2012

(Photo: BAE Systems)
(Photo: BAE Systems)
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
 

Logistics News

First Green Methanol Bunkering of New Car Carrier Successfully Completed

First Green Methanol Bunkering of New Car Carrier Successfully Completed

Egypt Looks to Sign Multi-Year LNG Supply Deal

Egypt Looks to Sign Multi-Year LNG Supply Deal

Houthis Threaten Targeted Attacks on Shipping Companies Visiting Saudi Ports

Houthis Threaten Targeted Attacks on Shipping Companies Visiting Saudi Ports

DP World, EBRD Sign $28m Loan to Electrify Constanța Terminal Operations

DP World, EBRD Sign $28m Loan to Electrify Constanța Terminal Operations

Subscribe for Maritime Logistics Professional E‑News

Middle Eastern airline executives project stability at Farnborough, despite conflict
EU wheat is flattened on signs that Russian/Ukrainian attacks at ports are not escalating
A northern city lost trains to London on the day Andy Burnham became UK PM