Engine Damage Knocks Ferry Out of Service

November 11, 2012

Propulsion Machinery Damage 'Walla Walla': Photo credit WSDOT
Propulsion Machinery Damage 'Walla Walla': Photo credit WSDOT

Washington State Ferry 'Walla Walla' suffers part engine meltdown in shiprepair yard putting it out of service indefinitely.

A failure in one of the drive motors on the 188-car ferry, Walla Walla, has left parts of the ferry near the engine melted and charred, and the vessel is inoperable and out of service indefinitely. The incident happened while the vessel was in for routine, regularly scheduled maintenance work on Sunday, Nov. 4, 2012; work which included inspection of electrical drive motors, overhauling the boiler and pre-checks for U.S. Coast Guard annual inspections.

The Walla Walla will be out of service for at least the next few months while crews work to repair the vessel. The drive motor that was damaged is one of four motors that turn the propellers.

Immediately following the incident, the Washington State Department of Transportation Ferries Division started an internal investigation per standard protocol. Preliminary findings indicate that there was no explosion.

“This is a serious incident and we’re going to do a very thorough and detailed investigation into what happened,” said David Moseley, WSDOT assistant secretary, ferries division. “We hope to return the vessel to service as soon as possible.”

Due to the severity of the damage, the investigation has been elevated to a third party contractor, Cadick Corporation. They will be assisted by WSDOT ferries division’s senior port engineers, safety systems managers, and electrical engineers. WSDOT has also reached out to the Department of Labor and Industries and the U.S. Coast Guard for assistance to ensure that all employee safety requirements were met. Detailed results of the investigation are expected within two to three weeks.

Ferry vessels will be shifted throughout the system in an effort to maintain service for passengers while the Walla Walla is unavailable.

Logistics News

DP World, Asian Terminals Inc. Invest $100M to Boost Capacity at Manila South Harbor

DP World, Asian Terminals Inc. Invest $100M to Boost Capacity at Manila South Harbor

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Subscribe for Maritime Logistics Professional E‑News

Turkey maintains its commitment to the contested "Kanal Istanbul" project
Cargill and LDC among the winners of Brazil's port auction
JSW Infra, India's JSW Infra, posts 54% increase in quarterly profit due to higher coal volume