Coronado (LCS 4) Keel Laying

December 22, 2009

Photo courtesy Austal
Photo courtesy Austal

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Logistics News

US, Australia Sign Critical Minerals Agreement, Back Submarine Deal

US, Australia Sign Critical Minerals Agreement, Back Submarine Deal

Alaska LNG Pipeline Study Will Be Completed This Year

Alaska LNG Pipeline Study Will Be Completed This Year

Maritime Recruitment Webinar: How Much Does "Connectivity" Matter

Maritime Recruitment Webinar: How Much Does "Connectivity" Matter

Russian Wheat Export Prices Climb, Increasing October Estimates

Subscribe for Maritime Logistics Professional E‑News

Sources say that the attack by a Ukrainian drone on a Russian gas plant has affected Kazakh production
Poland arrests eight suspects of planning acts of terrorism
Enagas Spain is on track to reach 2025 targets