Coronado (LCS 4) Keel Laying

December 22, 2009

Photo courtesy Austal
Photo courtesy Austal

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Logistics News

Mercuria Sues Baltic Exchange Over Freight Losses from Hormuz Closure

Mercuria Sues Baltic Exchange Over Freight Losses from Hormuz Closure

Ukrainian Drones Hit Tuapse Port Again, Environmental Crisis Deepens

Ukrainian Drones Hit Tuapse Port Again, Environmental Crisis Deepens

Russian Attack Hits Port Infrastructure

Russian Attack Hits Port Infrastructure

Port Snared in US-China Dispute, says Panama President

Port Snared in US-China Dispute, says Panama President

Subscribe for Maritime Logistics Professional E‑News

Oscar statuette for 'Mr. The flight carrying 'Nobody Against Putin" is missing
Trump announces a 25% tariff on EU automobiles
Iraqi state news agency reports that work has begun on the Basra-Haditha pipeline.