Closed Portion of Houston Ship Channel Opens

September 29, 2009

The three mile portion of the 52-mile Houston Ship Channel that was closed due to an oil spill Sept. 25 opened at 12:45 p.m. Sept. 28 to vessel traffic.

 The channel, which was closed between Old Manchester Dock Three and City Dock 27, is open to all daylight operations and limited night time barge operations.

The Coast Guard Vessel Traffic Service is managing all vessel movement.

The Captain of the Port, Capt. Marcus Woodring, determined the oil is contained along the shoreline, making it safe to resume traffic flow through the affected area at a slow speed.

Responders will continue to work to recover the remaining oil in the area. The exact amount of oil recovered is unknown, but as of 2 p.m. 23,418 gallons of an oil and water mixture has been recovered.

Logistics News

Sheskharis Terminal Pauses Loadings Following Drone Attack

Sheskharis Terminal Pauses Loadings Following Drone Attack

European Wheat Rises as Black Sea Disruptions Persist

European Wheat Rises as Black Sea Disruptions Persist

AD Ports Group Reports Strong Q2

AD Ports Group Reports Strong Q2

Drone Attack Sparks Fire at Ust-Luga Port

Drone Attack Sparks Fire at Ust-Luga Port

Subscribe for Maritime Logistics Professional E‑News

Sources say that the Sheskharis terminal in Russia's Black Sea halted loadings following a drone attack.
Smart trucks and tugs that never sleep. Automation rewires US transport: Maguire
Sources: Drone attack damages Novatek's Ust-Luga processing complex for gas condensate, according to sources