Green Canyon News

 

Weatherford lands 1180-ton casing string

Dec 17, 2015

Weatherford achieved a new world record by landing an 1180-ton (2,360,700-lb) casing string at a total depth of 26,805 ft (8170 m). The job was performed on a deepwater rig in the Gulf of Mexico this fall. The operator of a deepwater rig in the Green Canyon required installation of a heavy…

1 dead in GoM accident

Oct 20, 2015

An accident onboard the drillship Pacific Santa Ana has left one worker dead. The news was confirmed by the US Bureau of Safety and Environmental Enforcement (BSEE), operator Chevron, and the drillship's owner, Pacific Drilling. The Pacific…

Freeport-McMoRan updates GoM activities

Sep 28, 2015

Freeport-McMoRan announced positive drilling results from the Freeport-McMoRan Oil & Gas (FM O&G) 100%-owned Horn Mountain Deep well in the Deepwater Gulf of Mexico (GoM). Initial production from this well, which will be tied back to existing facilities…

Vallourec begins Stampede gig

Sep 23, 2015

Vallourec delivered 14,000-tonne of premium tubes in the scope of a contract with Hess Corp. for the Stampede project in the US Gulf of Mexico. Stampede is a deepwater subsea development which is located in the Green Canyon Block area…

InterMoor completes Heidelberg hook-up

Aug 12, 2015

InterMoor provided Anadarko Petroleum Corp. with rapid hook-up services for their Heidelberg truss spar in the deepwater Gulf of Mexico after stepping in at short notice for another contractor. The company hooked up the 80,000 b/d spar to three mooring lines in Green Canyon block 860…

2H Offshore wins two Stampede contracts

Jul 08, 2015

2H Offshore has been awarded two separate contracts, one by Hess Corp. and a second contract by Enbridge Energy Co., to verify the design, fabrication and installation phases of the steel catenary risers (SCRs) for the Stampede field development in the Gulf of Mexico (GOM)…

Harris CapRock wins Stampede contract

May 27, 2015

Harris CapRock Communications, a provider of managed communications services for remote and harsh environments, has been selected by Hess Corp. to provide a turnkey, integrated telecommunications solution to support the Stampede offshore field development project…

Schlumberger completes GOM shoot

Mar 23, 2015

Schlumberger has completed the acquisition of about 2750sq km of two new full-azimuth multiclient seismic surveys over the Garden Banks and Green Canyon areas in the Gulf of Mexico. Both shoots are the initial phase of the Revolution X and Revolution XI surveys and will provide full-azimuth…

Oceaneering lands Stampede umbilicals contract

Jan 21, 2015

Oceaneering International is to provide the umbilicals and umbilical distribution hardware for Hess' Stampede Project in the Green Canyon area of the US Gulf of Mexico. The hardware will be used to transmit hydraulic control fluids, chemicals…

Enbridge building Stampede pipeline

Jan 13, 2015

Hess awarded Enbridge a contract to build, own, and operate a lateral pipeline estimated at US$130 million, to connect the Stampede development to an existing third-party pipeline system in the Gulf of Mexico. Gulf of Mexico platform…

Chevron Jack/St. Malo first oil

Jan 06, 2015

Chevron discusses what it takes to deploy the technology and deliver first oil from the Jack/St. Malo fields, which are among the largest in the Gulf of Mexico. Discovered more than a decade ago, Jack and St. Malo are expected to deliver more than 500MMbbl…

Subsea 7 on Stampede installation

Dec 17, 2014

Subsea 7 has been awarded a contract by the Hess Corporation for installation work in support of the Stampede Project in deepwater US Gulf of Mexico.  The scope of work involves installation of flowlines, steel catenary risers, umbilicals…

Hess hits first oil from Tubular Bells

Nov 17, 2014

Hess Corp. began production from the Tubular Bells field, located in the Mississippi Canyon area of the deepwater Gulf of Mexico. The Tubular Bells floating production facility. From Hess…

Technip gets Anadarko GoM subsea contract

Nov 13, 2014

Anadarko Petroleum Corp. awarded Technip a contract for the K2 Riser Base Gas Lift project, located in Green Canyon 608 in the Gulf of Mexico, at a water depth of approximately 1300m. Upon the terms of agreement, Technip will provide…

Pulse uses INTEGRI sensors in Gulf of Mexico

Nov 04, 2014

Pulse designed, manufactured and installed a powerful motion and strain monitoring system to verify the design of the first lazy-wave steel riser system to be installed in the Gulf of Mexico. The monitoring program at Anadarko’s Constitution…

Logistics News

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Syria Signs New 30-Year Deal with CMA CGM

Syria Signs New 30-Year Deal with CMA CGM

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Subscribe for Maritime Logistics Professional E‑News

Syria signs 30-year agreement with French shipping giant CMA CGM
Data and sources say that the last Chevron chartered vessel is returning oil cargo to Venezuela.
Turkey maintains its commitment to the contested "Kanal Istanbul" project