Vestdavit to Equip Norwegian CG Vessels

September 10, 2019

Photo courtesy of Vestdavit
Photo courtesy of Vestdavit

Vestdavit secured an order to supply three new Norwegian Coast Guard vessels with davits equipped for polar conditions, in a project which also calls for installation of a deck-mounted transfer system for rapid deployment.

The ships are being built by Vard Group within the P6615 project to replace Nordkapp-class ships with a new generation of search-and-rescue, surveillance, and oil recovery vessels. The 136m length newbuildings have been developed for worldwide operations including arctic areas and will feature ice-strengthened hulls and ice-class notation on their delivery from Vard Langsten, Norway, one apiece in 2022, 2023 and 2024.

Each vessel will come complete with one telescopic TBD-10000L davit system plus two PLR-5003KV units, built to Vestdavit standards for minimum availability of 330 days a year up to upper Sea State 5, based on actual North Sea conditions 1958-2018. In line with the areas of operation envisaged, the davits will be winterized for full functionality in temperatures as low as -25deg C, as required in the Polar Code.

Logistics News

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Syria Signs New 30-Year Deal with CMA CGM

Syria Signs New 30-Year Deal with CMA CGM

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Subscribe for Maritime Logistics Professional E‑News

Equinor anticipates a tight European summer gas supply
Russian ESPO Blend oil shipping rates are at their lowest level since January, traders report
Ukraine's farm exports fell 23% month-on-month in April, according to lobby.