Great Lakes Shipyard Awarded Coast Guard Contract

Press Release
Tuesday, March 19, 2013

The shipyard has been awarded a drydocking & repair contract for the United States Coast Guard Cutter 'Neah Bay' (WTGB-105).

Contracted work includes routine drydocking and underwater hull maintenance, including inspection and testing of propulsion systems; overhaul of sea valves and shaft seal assemblies; and other various cleaning, inspections, and repairs.

This will be the first of the USCG’s nine (9) 140-foot Bay Class ice breaking tugs to be drydocked using Great Lakes Shipyard’s new Marine Travelift. The Travelift, with a lift capacity of 770-tons, was specifically designed and sized to accommodate the Bay-Class Coast Guard Cutters.

Work on the 'Neah Bay' will begin in early May 2013 and is expected to be completed by late June.
 

Categories: Contracts Great Lakes Ship Repair & Conversion

Related Stories

Terminal Portuario de Guayaquil Celebrates A Successful 2025

HAROPA PORT Achieves Record 2025 Results, Accelerates Green Corridor Strategy

UTC Enters into Asia-Pacific Market with Singapore Hub

Current News

Terminal Portuario de Guayaquil Celebrates A Successful 2025

ICS Launches New Deck Procedures Guide

HAROPA PORT Achieves Record 2025 Results, Accelerates Green Corridor Strategy

UTC Enters into Asia-Pacific Market with Singapore Hub

Subscribe for Maritime Logistics Professional E‑News