marine link image
Register now for the Port of the Future Conference • 2 Days, 50 Ports • Houston/Galveston area, TX • April 12–14, 2027

Port of Los Angeles Releases Environmental Impact Draft for Proposed Terminal Improvements

November 19, 2026

Location of proposed Marine Oil Terminal and Wharf Improvements Project at Berths

148-151, Port of Los Angeles. Credit: Port of Los Angeles
Location of proposed Marine Oil Terminal and Wharf Improvements Project at Berths 148-151, Port of Los Angeles. Credit: Port of Los Angeles

The Port of Los Angeles has released a Draft Environmental Impact Report (DEIR) for a proposed Marine Oil Terminal and Wharf Improvements Project, located at Berths 148-151 in Wilmington, a terminal operated by Phillips 66.

Phillips 66 proposes to construct a new berthing facility at Berths 150-151, compliant with Marine Oil Terminal Engineering and Maintenance Standards (MOTEMS). The existing wharf at Berths 148-149 would be used as a Marine Oil Terminal (MOT) while the new facilities at Berths 150-151 are being built.

Future uses at Berths 148-149 would be limited to non-MOT uses such as storage of topside equipment and the occasional mooring of harbor craft to reduce congestion in the channel. Landside facilities, including piping, vapor recovery systems, support systems, and tankage, would be modified and upgraded to support the new Berths 150-151 loading platform.

The proposed project includes consideration of up to 40 years of continued operation as a MOT at Berths 148-151, currently proposed via a new 20-year entitlement with two optional 10-year extensions.

To begin the environmental review process for this proposed project, the Port of Los Angeles released an Initial Study/Notice of Preparation (IS/NOP) in February 2023. Both the DEIR and IS/NOP are available for public review on the Port of Los Angeles website. The DEIR is intended to solicit additional feedback that can be incorporated into the Final Environmental Impact Report (FEIR).

The Port will hold a virtual public meeting via Zoom to receive comments on the DEIR at 4 p.m., Wednesday, Dec. 8. No registration is required. Simultaneous Spanish translation services will be provided.

Written comments on the DEIR may be submitted via email to [email protected] or to the following address during the public comment period through Monday, January 4, 2027:

Director of Environmental Management
Los Angeles Harbor Department
425 South Palos Verdes Street
San Pedro, CA 90731

Comment letters sent via email should include the Project title “Berths 148-151 (Phillips 66) Marine Oil Terminal and Wharf Improvements Project” in the email subject line and the commenter’s physical mailing address in the body of the email.

Logistics News

Middle East Conflict Could Cut Global Oil Demand by 4%

Middle East Conflict Could Cut Global Oil Demand by 4%

Russian Grain Export Capacity From Baltic Sea, Arctic Ports Quadruples

Russian Grain Export Capacity From Baltic Sea, Arctic Ports Quadruples

India Minimizes Reliance on Foreign Carriers by Permitting Older Vessels to Join Fleet

India Minimizes Reliance on Foreign Carriers by Permitting Older Vessels to Join Fleet

Trafigura Ship Fuel Venture Hesitant to Invest in Alternative Fuels Until Demand Rises

Trafigura Ship Fuel Venture Hesitant to Invest in Alternative Fuels Until Demand Rises

Subscribe for Maritime Logistics Professional E‑News

Russian strikes hit two bridges in Kyiv, cause water, power cuts, mayor says
LPG tanker sends distress signal off Bulgaria's Black Sea coast, maritime security sources say
Ukraine damages Crimean bridge in major strike as Russia pounds Kyiv bridges