marine link image

New Navy Contract

March 22, 2010

Northrop Grumman Shipbuilding, Inc., Newport News, Va., is being awarded an $80,886,408 cost-plus-fixed-fee, level-of-effort contract for fiscal 2010 advance planning to prepare and make ready for the refueling complex overhaul of the USS Abraham Lincoln (CVN 72) and its reactor plants. This effort will provide for all advanced planning, ship checks, design, documentation, engineering, procurement, fabrication, and preliminary shipyard or support facility work. The contract includes options which, if exercised, would bring the cumulative value of this contract to $678,568,820. Work will be performed in Newport News, Va., and is expected to be complete by February 2011. Contract funds will not expire at the end of the current fiscal year. This contract was not competitively procured. The Naval Sea Systems Command, Washington, D.C., is the contracting activity (N00024-10-C-2110).

Logistics News

Bunkering Hubs Along African Coast See Surge as Vessels Reroute

Bunkering Hubs Along African Coast See Surge as Vessels Reroute

Sugar Futures Fall as Oil Prices Slump

Sugar Futures Fall as Oil Prices Slump

Port of Oakland: Exports Continue to Outperform Imports

Port of Oakland: Exports Continue to Outperform Imports

Aker Solutions Wins FEED Contract for Lithuania CO₂ Terminal

Aker Solutions Wins FEED Contract for Lithuania CO₂ Terminal

Subscribe for Maritime Logistics Professional E‑News

After a terminal attack, an Indian vessel leaves Fujairah in the UAE
Sable Offshore is directed by the Trump administration to restore Santa Ynez Oil Unit
Spirit Airlines will shrink its fleet to a third of the size it was before bankruptcy